BLD-Aging Inspection | 12/18/2006 | 12/18/2006 | 12/21/2006 | | DEFR |
Jim Sly
|
|
|
Sent to Fire for final......
|
BLD-Aging Inspection | 10/6/2006 | 10/6/2006 | 10/13/2006 | | DONE |
Jim Sly
|
|
|
Talked to Ed ###-#### Same as prev. note.
|
BLD-Aging Inspection | 5/31/2006 | 5/31/2006 | 6/1/2006 | | PEND |
Jim Sly
|
|
|
Talked to Ed ###-#### Cannot find where fire signed off. Told him to call for fire final and see if fire insp can remember what and why?
|
BLD-Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 8:16:54 AM. Contact: ###-####. OK for Perm Occ. 8/1/2003 12:58:51 PM
|
Code Occupancy Approval | | | 7/31/2003 | | PASS |
|
|
|
FINAL SIGNED OFF.
|
FIRE-Alarm Testing | 7/23/2003 | 7/29/2003 | 7/28/2003 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 9:45:41 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 28 2003 7:26AM.
|
BLD-Framing/Rough-in | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 7:25:34 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/26/2003 | 6/27/2003 | 6/27/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 12:30:39 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/25/2003 at 7:22:36 AM. Contact: ###-####. OK to cover 90%....Need to check interior 1hr rated walls. 6/25/2003 4:51:48 PM
|
BLD-Conference | 6/20/2003 | 6/20/2003 | 6/20/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/20/2003 at 10:28:07 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/13/2003 | 6/16/2003 | 6/16/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 12:56:06 PM. Contact: ###-####. Roof nailing and 1hr wall OK to cover both sides at top. Storage/ library. 6/16/2003 12:03:28 PM
|
BLD-Framing/Rough-in | 6/9/2003 | 6/9/2003 | 6/9/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 7:02:53 AM. Contact: ###-####. Trusses and attachment to masonry walls (straps).....OK. 6/9/2003 12:55:42 PM
|
BLD-Footing | 4/28/2003 | 4/29/2003 | 4/29/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 9:26:03 AM. Contact: ###-####. E and W walls of front addition....N. wall Req further excavation and testing....all of rear (addition) and pad footings OK pending special insp and approvals. 4/29/2003 2:29:07 PM
|