BLD-Final | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PASS |
Russ Owen
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows. Ok perm oc. 7/23/2003 9:36:27 AM
|
Permanent Occupancy | | 7/22/2003 | 7/22/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/3/2003 | 7/3/2003 | 7/3/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire alarm, fire sprinkler and fire life safety finaled. Fire alarm system is complete
|
FIRE-Final Inspection | 5/16/2003 | 5/16/2003 | 5/16/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 5/8/2003 | 5/9/2003 | 5/9/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 10:50:55 AM. Contact: ###-####.Would be ok for an occupancy if fire life safety would approve. Not approved at this time due to this. 5/9/2003 10:31:08 AM
|
FIRE-Final Inspection | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | PART |
Troy Cobbley
|
|
|
A temp occupancy was given with Dave Millers permission until the fire alarm system for the shopco plaza has been inspected and approved. Fire sprinkler is finaled. Fire alarm has a temp. Fire life safety is ok except for the office door handle is not approved type. Since the south HVAC unit did not work I had Gary, the superintendant, lock out the unit until it can be repaired and reinspected
|
FIRE-Final Inspection | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | FAIL |
Troy Cobbley
|
|
|
Fire alarm issues have not been corrected and the door hardware to the office still needs changed 5/8/2003 3:11:18 PM
|
FIRE-Final Inspection | 5/6/2003 | 5/7/2003 | 5/7/2003 | P | FAIL |
Troy Cobbley
|
|
|
Could not connect the hood system to the fire alarm because fire alarm system is not complete yet. Painted sprinkler heads and canopies through out tenant space. Provide approved door hardware on the office door in kitchen area 5/7/2003 3:47:19 PM
|
BLD-Framing/Rough-in | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | PART |
Russ Owen
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Annette MooreOk to place tile. 5/6/2003 5:47:35 PM
|
BLD-Framing/Rough-in | 4/21/2003 | 4/21/2003 | 4/21/2003 | P | PART |
Russ Owen
|
|
|
hood shaft ###-####posted c/n for support clairification. 4/22/2003 10:25:50 AM
|
BLD-Framing/Rough-in | 4/18/2003 | 4/18/2003 | 4/18/2003 | P | NH |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/18/2003 | 4/18/2003 | 4/18/2003 | P | NH |
Russ Owen
|
|
|
###-#### hood shaft
|
BLD-Framing/Rough-in | 4/16/2003 | 4/17/2003 | 4/17/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/16/2003 at 12:18:00 PM. Contact: ###-####.Ok pending plumbing inspection posted c/n . 4/18/2003 10:37:25 AM
|