To demolish a existing single story single family residence and then construct a 4191 sq. ft. three story DUPLEX. UNIT 1 has three bedroom, two and three quarter bathroom with 2788 sq. ft. (861 sq. ft. first floor/1342 sq. ft. second floor/585 sq. ft. third floor) with a attached 478 sq. ft. two car garage, a 150 sq. ft. covered porch off the second floor and a 169 sq. ft. covered porch off the third floor. UNIT 2 has two bedroom, one and three quarter bathroom with 1403 sq. ft. (548 sq. ft. first floor/855 sq. ft. second floor) with a attached 420 sq. ft. two car garage and a 96 sq. ft. covered porch off the second floor. A SEPARATE PERMIT is required to construct the fence over four feet in height around unit 1. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALLS IS DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. NOTE: conversion permits and either a recorded subdivision or a zoning certificate and recorded of survey must be completed prior to selling as individual units. Per approved plans, engineering and requirement list. PC#084 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/23/20046/23/20046/23/2004APASS
DetailsTroy James
BLD-Final6/21/20046/21/20046/21/2004PFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 6/21/2004 at 7:36:12 AM. Contact: ###-####. Need to install step missing and landing to exterior door east side. Need to complete as much as possible setting fixtures and appliances, etc. 6/21/2004 11:28:41 AM
BLD-Conference4/12/20044/12/20044/12/2004PDONE
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Conference3/8/20043/9/20043/9/2004ADONE
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference2/9/20042/9/20042/9/2004PDONE
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in12/22/200312/22/200312/22/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/22/2003 at 7:20:22 AM. Contact: ###-####. ok to cover 12/22/2003 11:00:30 AM
BLD-Other12/22/200312/22/200312/22/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/22/2003 at 7:25:56 AM. Contact: ###-####.
BLD-Framing/Rough-in12/17/200312/17/200312/17/2003PPASS
DetailsJim Storey
DAVID; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance12/9/200312/10/200312/10/2003ACANC
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance12/10/200312/10/200312/10/2003PPART
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover int shear walls 12/10/2003 5:32:56 PM
BLD-Energy code compliance12/9/200312/9/200312/9/2003PNR
DetailsTroy James
David; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in11/21/200311/24/200311/24/2003APART
DetailsTony Young
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to start insulation, t/w contractor to call for inspection when special type of insulation is started so we can verify and approve of product, see jerry for correction notice.
strap beam/top plates, tighten bolts, fire block areas that wont be foam in place 11/24/2003 12:15:04 PM
BLD-Framing/Rough-in11/12/200311/13/200311/13/2003APART
DetailsDave Hannah
c/n items on shear done 11/13/2003 8:57:32 AM
BLD-Framing/Rough-in11/12/200311/12/200311/12/2003PCANC
DetailsRuss Owen
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore Out of time 11/12/2003 12:21:14 AM
BLD-Framing/Rough-in10/15/200310/15/200310/15/2003PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/15/2003 at 9:08:53 AM. Contact: ###-####. needs to finish nailing and bolting down hold downs 10/16/2003 8:05:05 AM
BLD-Conference9/30/200310/1/200310/1/2003ADONE
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in9/5/20039/8/20039/8/2003APART
DetailsDave Hannah
DONALD EXTERIOR SHEER ONLY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks west unit ok to cover ext 9/8/2003 9:56:28 AM
BLD-Concrete8/7/20038/7/20038/7/2003PPART
DetailsSteven Webb
###-#### east side 2nd floor deck, wip. 8/7/2003 3:05:13 PM
BLD-Conference7/16/20037/17/20037/17/2003ADONE
DetailsDave Hannah
###-#### david
BLD-Conference7/15/20037/15/20037/15/2003PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/15/2003 at 8:08:14 AM. Contact: ###-####. need to rerun energy code calcs 7/15/2003 2:34:58 PM
BLD-Conference6/26/20036/26/20036/26/2003PDONE
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation5/14/20035/14/20035/14/2003PPART
DetailsDave Hannah
darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore work in progress 5/14/2003 5:19:01 PM 5/14/2003 5:19:17 PM
BLD-Foundation5/9/20035/12/20035/12/2003ACANC
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing5/9/20035/9/20035/9/2003PPART
DetailsTony Young
darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip 5/9/2003 2:15:56 PM
BLD-Conference4/21/20034/21/20034/21/2003PFAIL
DetailsDave Hannah
issued a stop work