BLD-Final | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | PASS |
Dave Hannah
|
|
|
tony..; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows c.c # 23957 issued 7/16/2003 1:29:04 PM
|
BLD-Grading Inspection | 7/15/2003 | 7/15/2003 | 7/15/2003 | | BND |
Rita DeYoung
|
|
|
FINAL GRADING AND DRAINAGE IS COMPLETE AND APPROVED. REVEGETATION IS NOT AND FOR THIS THE ENGINEER HAS RECOMMENDED A $300.00 BOND. UPON RECEIPT OF THE BOND THE GRAIDNG AND DRAINAGE IS CONDITIONALLY APPROVED.
|
BLD-Energy code compliance | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | PASS |
Dave Hannah
|
|
|
TONY ###-#### ok to cover 5/15/2003 4:09:17 PM
|
BLD-Energy code compliance | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | FAIL |
Russ Owen
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. posted c/n hook up all bathroom fans and vapor barrier in upper bathroom and lower florr front room areas. c/n posted at front window . 5/14/2003 4:11:29 PM
|
BLD-Framing/Rough-in | 5/9/2003 | 5/12/2003 | 5/12/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/9/2003 at 11:40:54 AM. Contact: ###-####. ok to insulate 5/12/2003 11:31:22 AM
|
BLD-Framing/Rough-in | 4/25/2003 | 4/25/2003 | 4/25/2003 | P | PART |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Annette Moore shear ok to cover ext 4/25/2003 3:38:56 PM
|
BLD-Foundation | 3/31/2003 | 3/31/2003 | 3/31/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/31/2003 at 7:15:06 AM. Contact: ###-####.
|
BLD-Footing | 3/27/2003 | 3/28/2003 | 3/28/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 9:20:04 PM. Contact: ###-####.
|
BLD-Grading Inspection | 3/28/2003 | 3/28/2003 | 3/28/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|