BLD-Final | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PASS |
Jim Sly
|
|
|
###-####- rod New Eng for freestanding canopy OK....slab 6" ....OK. 12/11/2003 1:58:28 PM
|
FIRE-Sprinkler Rough-in | 11/13/2003 | 11/14/2003 | 11/14/2003 | A | PASS |
Troy Cobbley
|
|
|
###-####- rod Fire life safety finaled 11/14/2003 10:34:00 AM
|
BLD-Conference | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | PART |
Jim Sly
|
|
|
andy; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N Verify 6" slab....Resubmit shows column conn to slab but no details for connection to existing bldg....Eng to provide stamped detal .... Need fire and zoning final prior to struct......Cert of Compl OK when complete. 10/29/2003 1:06:24 PM
|
BLD-Framing/Rough-in | 9/5/2003 | 9/8/2003 | 9/8/2003 | A | FAIL |
Jim Sly
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore 9/8/2003 11:04:31 AM C/N...No insp of installed canopy....Not per appr plan. 9/8/2003 11:08:49 AM
|
BLD-Aging Inspection | 9/5/2003 | 9/5/2003 | 9/5/2003 | | FAIL |
Jim Sly
|
|
|
Dennis at Tates...###-####......Patio covers Unlimited did the work.
talked to Rob....will call in an insp. 9/5/2003 10:21:10 AM 9/5/2003 2:34:33 PM
|