BLD-Final | 8/13/2003 | 8/14/2003 | 8/14/2003 | P | PASS |
Tom Arcoraci
|
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | FAIL |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell cn issued handrail ht no elec final 8/13/2003 1:59:00 PM
|
BLD-Energy code compliance | 5/8/2003 | 5/9/2003 | 5/9/2003 | P | PASS |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 | A | PASS |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Energy code compliance | 5/6/2003 | 5/8/2003 | 5/8/2003 | P | CANC |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | NR |
Jim Storey
|
|
|
c/n not done. 5/8/2003 8:48:47 AM
|
BLD-Framing/Rough-in | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | PART |
Jim Storey
|
|
|
BRIAN ###-#### -RE-INSP fire blk ok truss bracing not done. 5/8/2003 1:45:49 PM
|
BLD-Framing/Rough-in | 5/6/2003 | 5/7/2003 | 5/7/2003 | P | PART |
Jim Storey
|
|
|
###-#### ###-#### foire blk 2 nd floor mech chase/ truss bracing. 5/7/2003 5:13:28 PM
|
BLD-Framing/Rough-in | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | PART |
Tom Arcoraci
|
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to side only 5/6/2003 4:14:06 PM
|
BLD-Framing/Rough-in | 4/28/2003 | 4/28/2003 | 4/28/2003 | P | NR |
Dave Hannah
|
|
|
bryan shear; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/2/2003 at 3:10:21 PM. Contact: ###-####.
|
BLD-Footing | 4/2/2003 | 4/2/2003 | 4/2/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/2/2003 at 6:46:44 AM. Contact: ###-####.checked set backs all ok 4/2/2003 11:59:26 AM
|