Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00435
StatusExpired
Name HOLLAND & HART (15TH FLOOR)
Site Address 101 S CAPITOL BLVD Unit: 1500
Project NameUS BANK-15TH FLR
Customer Number 
ePlanReviewNo
Description
(HOLLAND & HART - 15TH FLOOR) This building is fire sprinklered because it is a high-rise. To remodel an existing 11,930 square foot whole floor tenant space for the existing tenant. This space is located on the 15th floor (14,600 square feet) of an existing high-rise building. The "core" has a floor area of 2,670 square feet. The two existing "core" restrooms will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, interior windows and doors, millwork, finishes, and suspended ceilings all per approved drawings and plan review report on file. All new work associated with the existing elevator lobby/corridor shall comply with the 1-hr corridor provisions of the 2000 IBC. If not already existing, firesafing will be installed at the perimenter of the floor between the floor and the spandrel glass. Fire sprinkler heads shall be relocated to comply with NFPA 13-1999 as regulated by the Fire Department. (9-9-03) A "LETTER OF UNDERSTANDING" WAS SIGNED BY REPRESENTATIVES OF UNICO PROPERTIES (DAN PREISLER ON JUNE 17, 2003) AND THE CITY OF BOISE (TIM HOGLAND ON JUNE 19, 2003). THIS AGREEMENT ALLOWS THE PROVISIONS OF THE 2000 IBC TO BE APPLIED TO INDIVIDUAL FLOORS. IN ORDER TO APPLY THE 2000 IBC TO A FLOOR THE FIRE ALARM, FIRE SPRINKLER SYSTEM, AND HIGH-RISE LIFE SAFETY SYSTEMS ON THAT FLOOR (AND THE INFRASTRUCTURE SUPPORTING THESE SYSTEMS) MUST BE IN COMPLIANCE WITH THE 2000 IBC. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection9/1/20049/1/20049/1/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection6/24/20046/24/20046/24/2004 DONE
DetailsDave Hannah
BLD-Final10/6/200310/7/200310/7/2003APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/6/2003 at 4:52:35 PM. Contact: ###-####. ok for perm occ 10/7/2003 10:32:34 AM
BLD-Final10/3/200310/6/200310/6/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/3/2003 at 4:02:17 PM. Contact: ###-####. Ok temp oc , needs restroom signs posted for perm. 10/5/2003 9:02:05 PM
BLD-Final10/2/200310/3/200310/3/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/2/2003 at 3:12:07 PM. Contact: ###-####. needs fire life sfety and plumbing. 10/3/2003 12:16:32 AM. 10/3/2003 12:18:33 AM
FIRE-Final Inspection10/3/200310/3/200310/3/2003PPASS
DetailsRick Jackson
BLD-Framing/Rough-in9/12/20039/15/20039/15/2003APART
DetailsDave Hannah
ceiling grid in hallways ok 9/15/2003 10:01:57 AM
BLD-Framing/Rough-in9/12/20039/12/20039/12/2003PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/12/2003 at 9:58:13 AM. Contact: ###-####. out of time rescheduled for monday am 9/12/2003 4:52:01 PM
BLD-Framing/Rough-in8/13/20038/13/20038/13/2003PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/13/2003 at 8:14:10 AM. Contact: ###-####...firestops at pipes ok...added wire ok 8/13/2003 3:38:12 PM
BLD-Framing/Rough-in8/11/20038/12/20038/12/2003PPART
DetailsCarl Dependahl
Sam...need to firestop plbg stacks thru 2hr fl at cavity wall; ok to cover if accessible 8/12/2003 3:21:10 PM
BLD-Framing/Rough-in8/11/20038/11/20038/11/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/11/2003 at 7:20:11 AM. Contact: ###-####.
BLD-Framing/Rough-in8/6/20038/7/20038/7/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/6/2003 at 2:15:43 PM. Contact: ###-####.
BLD-Framing/Rough-in8/7/20038/7/20038/7/2003PNR
DetailsCarl Dependahl
need elec 1st 8/7/2003 3:11:47 PM
BLD-Framing/Rough-in8/7/20038/7/20038/7/2003PNR
DetailsCarl Dependahl
BLD-Framing/Rough-in7/31/20038/1/20038/1/2003PPART
DetailsCarl Dependahl
walls at elev shaft ok...patch holes below lid 8/1/2003 2:16:44 PM
BLD-Framing/Rough-in7/31/20037/31/20037/31/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/31/2003 at 8:53:24 AM. Contact: ###-####.
BLD-Framing/Rough-in7/29/20037/30/20037/30/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/29/2003 at 3:13:12 PM. Contact: ###-####. elev lobby need to fire caulk around pipes and along beam 7/30/2003 12:02:39 PM
BLD-Final6/19/20036/19/20036/19/2003APART
DetailsCarl Dependahl
###-####...ok to use north-east portion of office pending complete final. 6/20/2003 2:28:02 PM
FIRE-Final Inspection6/19/20036/19/20036/19/2003PPART
DetailsRick Jackson
Phase 1 okay to occupy
BLD-Framing/Rough-in5/15/20035/16/20035/16/2003APART
DetailsCarl Dependahl
walls ok at 15, North offices 5/16/2003 1:31:55 PM
BLD-Framing/Rough-in5/14/20035/15/20035/15/2003PPART
DetailsCarl Dependahl
SAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs...walls ok, keep c/n. 5/15/2003 4:30:34 PM
BLD-Framing/Rough-in5/12/20035/13/20035/13/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/12/2003 at 1:26:44 PM. Contact: ###-####....15th fl only, left c/n & notes to watch ADA at doors & floating grid clg...need other r/i's 1st. 5/13/2003 5:42:15 PM