Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-00440
StatusFinaled
Name DOUG OLSON CONSTRUCTION
Site Address 4979 N ARROW CREST WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4296 sq. ft. two story single family dwelling with a 1008 sq. ft. attached four car garage, a 56 sq. ft. covered entry porch and a 302 sq. ft. covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be maintained. (1st floor 3332 sq. ft.)(2nd floor 964 sq. ft.) PC #125 CU #44-94 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference1/28/20041/29/20041/29/2004APASS
DetailsTony Young
check on bond
BLD-Final1/28/20041/28/20041/28/2004PPASS
DetailsTony Young
Doug, ph# ###-####
BLD-Final1/27/20041/28/20041/28/2004ACANC
DetailsTony Young
doug ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Grading Inspection1/28/20041/28/20041/28/2004 BND
DetailsRita DeYoung
Rough grading complete and approved. Fine grading and revegetation incomplete. For this the engineer has recommended a $750.00 bond. Upon receipt of this bond the grading and drainage is conditionally approved.
BLD-Final1/26/20041/26/20041/26/2004PNR
DetailsTony Young
doug- ###-####
needs hillside 1st 1/26/2004 2:06:51 PM
BLD-Energy code compliance9/16/20039/16/20039/16/2003PPASS
DetailsJim Storey
###-#### albert
BLD-Framing/Rough-in9/10/20039/11/20039/11/2003ACANC
DetailsTony Young
doug; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in9/11/20039/11/20039/11/2003PPASS
DetailsTony Young
BLD-Framing/Rough-in9/2/20039/3/20039/3/2003APART
DetailsTony Young
DOUG; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
low on time, conf. only on frame issues, dont insulate 9/3/2003 10:21:13 AM
BLD-Framing/Rough-in8/22/20038/22/20038/22/2003PPART
DetailsTony Young
doug; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ext shear ok,,,, met w/ albert 8/22/2003 3:47:38 PM
BLD-Foundation6/20/20036/20/20036/20/2003PPART
DetailsTony Young
tray; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip 6/20/2003 4:36:06 PM
BLD-Footing6/18/20036/19/20036/19/2003APART
DetailsSteven Webb
re-inspection. Parameter footings per plan, need interior footings formed and rebar set. Received soils bearing letter from Briggs engineering. Letter stated soils ok. 6/19/2003 9:41:18 AM
BLD-Grading Inspection6/19/20036/19/20036/19/2003 PASS
DetailsRita DeYoung
Geotechnical engineer approved the footing subgrade
BLD-Footing6/18/20036/18/20036/18/2003PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/18/2003 at 9:56:55 AM. Contact: ###-####.
wip ftgs, 1/4 of bar in 6/18/2003 4:21:57 PM
BLD-Foundation6/18/20036/18/20036/18/2003PPART
DetailsTony Young
late pm ,,,, ftg only 6/19/2003 9:05:12 AM
BLD-Foundation6/2/20036/2/20036/2/2003PPART
DetailsTony Young
TREY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
wip 6/2/2003 2:31:49 PM
BLD-Footing5/29/20035/30/20035/30/2003PPART
DetailsTony Young
Trey ###-####, retaining wall ftg
BLD-Footing5/29/20035/29/20035/29/2003PPART
DetailsTony Young
trey; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need one more horizontal #4 bar 5/29/2003 2:31:29 PM
BLD-Grading Inspection5/29/20035/29/20035/29/2003 PASS
DetailsRita DeYoung
FOOTING SUBGRADE HAS BEEN APPROVED BY THE GEOTECHNICAL ENGINEER