BLD-Final | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | DONE |
Tom Arcoraci
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 5/30/2003 | 5/30/2003 | 5/30/2003 | P | PASS |
Carl Dependahl
|
|
|
RA grills back-ordered...ok 5/30/2003 4:44:36 PM
|
BLD-Final | 5/30/2003 | 5/30/2003 | 5/30/2003 | P | PASS |
Carl Dependahl
|
|
|
ok for c/o fees owing okay per Linda
|
FIRE-Final Inspection | 5/29/2003 | 5/30/2003 | 5/30/2003 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. The contractor said that he had an agreement with Carl about the thumbturn on the front door. I notified Carl Dependahl 5/30/2003 3:37:59 PM
|
Permanent Occupancy | | 5/30/2003 | 5/30/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/28/2003 | 5/28/2003 | 5/28/2003 | P | PART |
Carl Dependahl
|
|
|
joe ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...grid at storeroom ok... 5/28/2003 1:59:22 PM
|
BLD-Conference | 5/21/2003 | 5/21/2003 | 5/21/2003 | P | FAIL |
Carl Dependahl
|
|
|
###-####, c/n...need min 4" step or ramp 5/21/2003 4:04:13 PM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | PART |
Carl Dependahl
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walls patched &penetrations ok, lid ok pend elec. & hvac 5/13/2003 4:19:45 PM
|
BLD-Framing/Rough-in | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | PART |
Carl Dependahl
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; need patch demising wall, add blocking at restroom walls, etc. storefront not in yet. need IECC for elec, & hvac. 5/9/2003 11:57:49 AM 5/9/2003 4:53:02 PM
|