BLD-Aging Inspection | 5/13/2005 | 5/13/2005 | 5/13/2005 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 5/13/2005 | 5/13/2005 | 5/13/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 10/23/2003 | 10/23/2003 | 10/23/2003 | P | DONE |
Russ Owen
|
|
|
ok for perm. occ.
|
BLD-Final | 10/21/2003 | 10/21/2003 | 10/21/2003 | P | PART |
Russ Owen
|
|
|
JOE; Phone #: ###-#### Internet Inspection Request from: Annette Moore A/c units at doors gone still need verification of insulation in cmu, contractor notified. 10/20/2003 9:15:22 PM
|
BLD-Final | 10/7/2003 | 10/8/2003 | 10/8/2003 | A | PART |
Russ Owen
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Ok temp oc , needs a/c units moved away from 2 doors and letter from insulation contractor foe cmu insulation, contractor on site notified. 10/7/2003 6:03:08 PM
|
FIRE-Final Inspection | 10/7/2003 | 10/7/2003 | 10/7/2003 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Final Inspection | 10/1/2003 | 10/1/2003 | 10/1/2003 | P | FAIL |
Troy Cobbley
|
|
|
Still need permanent building address and suite numbers for a life/safety sign off.
|
FIRE-Final Inspection | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | FAIL |
Troy Cobbley
|
|
|
need fire alarm finaled, lower and tag fire extinguishers, provide building address and suite numbers, install fire hydrant (I'm expecting a call from united water) 9/30/2003 12:05:17 PM
|
Code Occupancy Approval | 9/25/2003 | 9/25/2003 | 9/25/2003 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliancae met. 9/25/2003 11:39:24 AM
|
BLD-Final | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | FAIL |
Russ Owen
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Darla Downs not ready but did go over job and found a/c units in exterior walls which will need to be moved. 9/24/2003 6:40:44 PM
|
BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 | P | PASS |
Russ Owen
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Russ Owen
|
|
|
JOE; Phone #: ###-#### Internet Inspection Request from: Darla Downs 2 c/ns new details for trusses b-18 to 28 and block/nail attic side of shear wall . went over this with contractor. will recall. 8/7/2003 3:10:21 PM
|
BLD-Framing/Rough-in | 8/5/2003 | 8/5/2003 | 8/5/2003 | P | FAIL |
Russ Owen
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N posted for roof trusses and other items metal framed walls ok to cover. 8/5/2003 5:24:22 PM
|
BLD-Framing/Rough-in | 7/18/2003 | 7/21/2003 | 7/21/2003 | P | PART |
Tom Arcoraci
|
|
|
joe ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to roof 7/21/2003 2:46:06 PM
|
BLD-Framing/Rough-in | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | FAIL |
Russ Owen
|
|
|
JOE...ROOF SHEETING; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows c/n posted on window of trailer. 7/18/2003 1:49:05 PM
|
BLD-Footing | 5/30/2003 | 5/30/2003 | 5/30/2003 | P | PART |
Russ Owen
|
|
|
joe re-bar; Phone #: ###-#### Internet Inspection Request from: Barbara MooreNote: special inspection will be performed and is required. 5/30/2003 3:06:22 PM
|