Permanent Occupancy | | 3/23/2004 | 3/23/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/19/2004 | 3/19/2004 | 3/19/2004 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Final Inspection | 3/11/2004 | 3/15/2004 | 3/15/2004 | P | FAIL |
Rick Jackson
|
|
|
Mike, ###-#### voltage drop nearly 3 volts; NAC's not wired per plans 3/15/2004 4:38:58 PM
|
FIRE-Final Inspection | 12/12/2003 | 12/12/2003 | 12/12/2003 | A | PART |
Rick Jackson
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Darla Downs temp occupancy approved per Dave Miller pending installation of fire alarm 12/12/2003 10:09:12 AM
|
FIRE-Final Inspection | 11/26/2003 | 11/26/2003 | 11/26/2003 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/26/2003 at 9:28:20 AM. Contact: ###-####. need alarm plans per plans review notes 11/26/2003 2:14:54 PM
|
FIRE-Final Inspection | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | FAIL |
Rick Jackson
|
|
|
mike sign off sheets are in 102; Phone #: ###-#### Internet Inspection Request from: Darla Downs need smoke detectors at units #106 and 206 in hallway to bedrooms and at vaulted ceiling area; hang extinguishers; submit alarm plans per plan review note number 3 - a pull station and one horn/strobe is installed on the first floor of each stair - work performed without permit 11/25/2003 2:48:58 PM
|
Code Occupancy Approval | 11/24/2003 | 11/24/2003 | 11/24/2003 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 11/24/2003 3:10:23 PM
|
BLD-Framing/Rough-in | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/26/2003 at 9:22:20 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | FAIL |
Dave Hannah
|
|
|
|
BLD-Conference | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Conference | 8/18/2003 | 8/18/2003 | 8/18/2003 | P | CANC |
Dave Hannah
|
|
|
MIKE PLEASE CALL FIRST SO HE CAN MAKE SURE THAT HIS HEATING GUY IS THERE..; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 12:46:40 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/28/2003 | 7/28/2003 | 7/28/2003 | A | PART |
Dave Hannah
|
|
|
ext sheet rock shear nailing and strapes hold downs ok to cover south and east sides
|
BLD-Conference | 7/24/2003 | 7/24/2003 | 7/24/2003 | P | DONE |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 7/24/2003 at 8:23:37 AM. Contact: ###-####.
|
BLD-Conference | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | DONE |
Dave Hannah
|
|
|
b j ###-####--call 1st before insp
|
BLD-Framing/Rough-in | 6/17/2003 | 6/17/2003 | 6/17/2003 | P | NR |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore looked at wall and floor to floor straping and shear wall details 6/17/2003 4:59:17 PM
|
BLD-Foundation | 5/21/2003 | 5/22/2003 | 5/22/2003 | A | PASS |
Dave Hannah
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Foundation | 5/19/2003 | 5/19/2003 | 5/19/2003 | P | PART |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore north half of high wall 5/19/2003 3:18:49 PM
|
BLD-Foundation | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | PART |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore all 2 ft stem wall 5/15/2003 5:24:23 PM
|