BLD-Final | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/17/2003 at 6:01:01 PM. Contact: ###-####. l/c isued no plm.work performed. 12/18/2003 9:40:06 AM
|
BLD-Final | 12/16/2003 | 12/17/2003 | 12/17/2003 | A | FAIL |
Jim Storey
|
|
|
Stan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes remove dead bolt from back exit door. 12/17/2003 1:40:09 PM
|
FIRE-Final Inspection | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | PASS |
Rick Jackson
|
|
|
stan wiggins; Phone #: ###-#### Internet Inspection Request from: Barbara Moore per architect the occupant load in bar and back dining area require one exit and the two exits from the main dining area are adequate 12/16/2003 10:14:13 AM
|
FIRE-Final Inspection | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | FAIL |
Rick Jackson
|
|
|
Stan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes exit door hardware and exit signs where dorrs have changed; need from architect required exits and occupant loads to verify exiting requirements 12/12/2003 4:06:43 PM
|
BLD-Framing/Rough-in | 12/4/2003 | 12/5/2003 | 12/5/2003 | A | PART |
Tom Arcoraci
|
|
|
stan -###-#### ok to cover vestibule 12/5/2003 9:16:27 AM
|
BLD-Footing | 10/28/2003 | 10/29/2003 | 10/29/2003 | A | PASS |
Jim Storey
|
|
|
ft - stan - ###-#### pad footings on north side ok. 10/29/2003 8:56:43 AM
|
BLD-Framing/Rough-in | 10/29/2003 | 10/29/2003 | 10/29/2003 | A | PASS |
Jim Storey
|
|
|
north west corner of blding sheer nailling approved.
|
BLD-Conference | 10/7/2003 | 10/8/2003 | 10/8/2003 | A | PASS |
Jim Storey
|
|
|
Please call before inspection//stan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|