BLD-Final | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 3:41:36 PM.
|
BLD-Final | 10/2/2003 | 10/2/2003 | 10/2/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 7:16:03 AM. provide protection of wood in contact with wood sidding/ 10/2/2003 2:12:44 PM
|
BLD-Final | 10/1/2003 | 10/1/2003 | 10/1/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 7:08:54 AM. posted c/n on front window. 9/30/2003 10:32:50 PM
|
BLD-Energy code compliance | 7/25/2003 | 7/25/2003 | 7/25/2003 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/24/2003 at 1:23:24 PM.
|
BLD-Wall cover | 7/22/2003 | 7/23/2003 | 7/23/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/22/2003 at 1:34:45 PM. needs shear walls in garage installed 7/23/2003 9:47:12 AM
|
BLD-Framing/Rough-in | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/16/2003 at 8:51:48 AM.
|
BLD-Other | 6/26/2003 | 6/27/2003 | 6/27/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 4:34:45 PM. Contact: ###-####. shear nail ok to cover ext 6/30/2003 8:56:12 AM
|
BLD-Foundation | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PASS |
Dave Hannah
|
|
|
WES- ###-####
|
BLD-Footing | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | PART |
Dave Hannah
|
|
|
work in progress setbacks ok forms at about 50 %
|
BLD-Foundation | 5/12/2003 | 5/13/2003 | 5/13/2003 | P | NR |
Dave Hannah
|
|
|
sniper; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|