BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 8:38:53 AM. Contact: ###-####. Ok perm oc. 12/9/2003 2:16:31 PM
|
BLD-Final | 12/3/2003 | 12/4/2003 | 12/4/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/3/2003 at 3:56:17 PM. Contact: ###-####. All ok signatures on card. I meet with contractor at site, and showed him 2 flexible gas pipes coming down above furnace that I wanted protected at the sheet metal panning I noted this with person who meet me for insulation inspection. 12/5/2003 1:09:07 PM
|
Permanent Occupancy | | 12/4/2003 | 12/4/2003 | | DONE |
|
|
|
|
BLD-Final | 11/20/2003 | 11/21/2003 | 11/21/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/20/2003 at 4:18:16 PM. Contact: ###-####. ok for temp occ needs to move ada RESTROOM SIGN AND GET PUBLIC WORKS TO SIGN PERM 11/21/2003 1:38:29 PM
|
FIRE-Final Inspection | 11/19/2003 | 11/20/2003 | 11/20/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 11/20/2003 3:46:42 PM
|
Code Occupancy Approval | | | 11/20/2003 | | PASS |
|
|
|
LOOKS GREAT FINAL SIGNED OFF.
|
BLD-Energy code compliance | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 7:57:30 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 7:56:52 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 8:28:23 AM. Contact: ###-####.still waiting for truss repair detail will get this them meet on site at next inspection. 9/19/2003 12:24:56 AM
|
BLD-Framing/Rough-in | 9/16/2003 | 9/16/2003 | 9/16/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 8:00:52 AM. Contact: ###-####.c/n posted. 9/16/2003 1:23:29 AM
|
BLD-Framing/Rough-in | 9/10/2003 | 9/11/2003 | 9/11/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/10/2003 at 9:02:41 AM. Contact: ###-####. C/n posted for interior, also needs mechanical approved 9/10/2003 10:17:30 PM
|
BLD-Conference | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | DONE |
Russ Owen
|
|
|
went by job, noticed soffit material on building, called contractor and advised them to call for inspection prior to covering anymore. 8/14/2003 4:09:31 PM 8/14/2003 4:09:49 PM
|
BLD-Foundation | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PASS |
Jim Sly
|
|
|
mana; Phone #: ###-#### Internet Inspection Request from: Annette Moore (2500) PSI No special Insp. 6/26/2003 10:23:04 AM
|
BLD-Foundation | 6/24/2003 | 6/25/2003 | 6/25/2003 | P | CANC |
Russ Owen
|
|
|
mana; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 6/19/2003 | 6/20/2003 | 6/20/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|