Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00759
StatusFinaled
Name CRITICAL CARE SYSTEMS
Site Address 12301 W EXPLORER DR Unit: 126
Project NameBRC GENESIS BLDG
Customer Number 
ePlanReviewNo
Description
(CRITICAL CARE SYSTEMS)(BRC GENESIS BLDG-STE 126) To remodel a 5,897 sq. ft. portion of an existing building for a new office tenant space per approved plans on file. Work to include, construction of interior partitions to create office spaces, work areas, break room, pharmacy, and a shipping and receiving area, Installaton of a new suspended ceiling system, new lighting, new counters and cabinets. Miscelaneous related interior finishes. This building is fully fire sprinklerd for area increase, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (pc#188-03) rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/1/20037/1/20037/1/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/1/2003 at 9:35:57 AM. Contact: ###-####. OK for Perm Occ. :) :) :) 7/1/2003 1:17:15 PM
FIRE-Final Inspection7/1/20037/1/20037/1/2003APASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinkler are finaled
FIRE-Final Inspection7/1/20037/1/20037/1/2003PPASS
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 7/1/2003 at 9:34:26 AM. Contact: ###-####.
Permanent Occupancy 7/1/20037/1/2003 DONE
Details
BLD-Final6/27/20036/30/20036/30/2003PNR
DetailsJim Sly
###-####
FIRE-Final Inspection6/27/20036/30/20036/30/2003AFAIL
DetailsTroy Cobbley
###-#### The map for the facp that was provided did not match what has been installed and did not include device addresses 6/30/2003 11:14:02 AM
BLD-Final6/27/20036/27/20036/27/2003PFAIL
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need fire final 6/27/2003 4:25:44 PM
FIRE-Final Inspection6/27/20036/27/20036/27/2003PFAIL
DetailsTroy Cobbley
Can't final life safety until the fire alarm has been finaled but it is ready to be finaled 6/27/2003 11:33:43 AM
BLD-Framing/Rough-in6/19/20036/19/20036/19/2003PPASS
DetailsJim Sly
Jim ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Conference6/4/20036/4/20036/4/2003PPASS
DetailsJim Sly
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
FIRE-Conference6/4/20036/4/20036/4/2003PDONE
DetailsTroy Cobbley
jim; Phone #: ###-#### I spoke to jim about the door hardware required at all the exits. I noticed a manual pull station in the tenant space and told him the fire alarm system would need to be addressed before a final inspection was passed 6/4/2003 4:04:17 PM
BLD-Framing/Rough-in5/20/20035/21/20035/21/2003PPASS
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore 5/21/2003 3:31:33 PM Clean room ok. 5/21/2003 3:31:59 PM
BLD-Framing/Rough-in5/15/20035/16/20035/16/2003PPART
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Frame OK except Clean room. 5/16/2003 4:12:17 PM