BLD-Final | 2/19/2004 | 2/19/2004 | 2/19/2004 | P | PASS |
Dave Hannah
|
|
|
###-#### Aaron ok for perm occ 2/19/2004 2:39:25 PM
|
FIRE-Final Inspection | 2/19/2004 | 2/19/2004 | 2/19/2004 | P | PASS |
Rick Jackson
|
|
|
###-#### aaron
|
Permanent Occupancy | | 2/19/2004 | 2/19/2004 | | DONE |
|
|
|
|
BLD-Conference | 2/17/2004 | 2/17/2004 | 2/17/2004 | P | DONE |
Dave Hannah
|
|
|
five day notice given 2/17/2004 2:05:43 PM
|
BLD-Final | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | PART |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...see c/n , ok for t/o 8/6/2003 6:27:33 PM
|
FIRE-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | PART |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungtemp occ approvede per Dave Miller pending resolution of fire sprinklers; need to complete emergency lighting in north hall; complete alarm per latest review 8/7/2003 9:21:19 AM
|
BLD-Conference | 8/3/2003 | 8/4/2003 | 8/4/2003 | P | PASS |
Carl Dependahl
|
|
|
rec'd resub...ok 8/4/2003 4:15:51 PM
|
BLD-Conference | 7/29/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Carl Dependahl
|
|
|
Scott...need all finals for c/o. 7/30/2003 3:20:56 PM
|
BLD-Conference | 7/30/2003 | 7/30/2003 | 7/30/2003 | A | PASS |
Carl Dependahl
|
|
|
ok to use occ. loads as clouded on plans....49" wide foyer ok at main st side per Carl Westfall...resub. pending7/30/2003 10:39:01 AM 7/30/2003 10:41:36 AM
|
BLD-Conference | 7/29/2003 | 7/29/2003 | 7/29/2003 | P | PASS |
Carl Dependahl
|
|
|
aaron...occ. loads... 7/29/2003 3:33:44 PM ok per Carl Westfall...as 1st set of numbers on plans. 7/29/2003 3:37:39 PM
|
BLD-Framing/Rough-in | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PART |
Carl Dependahl
|
|
|
AARON...need all as-builts...floor cavities have been filled w/ insulation mat'l as req'd 7/29/2003 1:44:36 PM
|
FIRE-Final Inspection | 7/28/2003 | 7/28/2003 | 7/29/2003 | P | FAIL |
Rick Jackson
|
|
|
###-#### not a final; verified insulation in two cavities - okay to cover - area by main entry at dance floor extension and on stage on second floor 7/29/2003 5:06:29 PM
|
BLD-Final | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | FAIL |
Carl Dependahl
|
|
|
###-####...c/n, n/r... 7/28/2003 3:21:34 PM
|
BLD-Conference | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 9:55:18 AM. Contact: ###-####...met w/ eng'r & contractor...need stamped eng'g for frame & stair modifications; arch to give as-builts 7/23/2003 3:58:56 PM
|
FIRE-Conference | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | DONE |
Troy Cobbley
|
|
|
Went over exit sign and emergency light locations for the second floor. Rick or I need to provide clarification on door magnets, releasing, to the members only area. Told Scott the contractor to provide fire extinguishers especially since welding is going on in building 7/24/2003 12:10:29 PM
|
BLD-Framing/Rough-in | 7/21/2003 | 7/22/2003 | 7/22/2003 | P | PART |
Carl Dependahl
|
|
|
arron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok to cover walls & lid at back of 1st fl; cosult fire insp re platforms/sprinklers. Need resub for stairs. 7/22/2003 5:00:35 PM
|
BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 | A | PART |
Carl Dependahl
|
|
|
aaron; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...c/n issued; need proper resub....ok to cover 1st fl lid 7/17/2003 3:35:21 PM
|
BLD-Conference | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 4:38:53 PM. Contact: ###-####...need submit for stairs & star framing. 7/11/2003 7:00:07 PM
|
BLD-Conference | 7/1/2003 | 7/3/2003 | 7/3/2003 | P | PASS |
Carl Dependahl
|
|
|
Scott...need plan mod permit, install all rails
& doors as req'd 7/3/2003 4:18:00 PM
|
BLD-Conference | 6/30/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Carl Dependahl
|
|
|
keep c/n, fireblocks installed, reinstall door at stair enclosure, firestop penetrations...reinstall temp rails as permanent; provide copy of as-built re rails & platform at basement. 7/1/2003 1:24:35 PM 7/1/2003 1:24:54 PM
|
BLD-Final | 6/26/2003 | 6/27/2003 | 6/27/2003 | P | PART |
Carl Dependahl
|
|
|
###-#### SCOTT BASEMENT ONLY ...c/n, ok for t/o 6/27/2003 6:15:07 PM
|
FIRE-Final Inspection | 6/26/2003 | 6/27/2003 | 6/27/2003 | A | PART |
Rick Jackson
|
|
|
basement only okay 6/30/2003 9:00:42 AM
|
BLD-Framing/Rough-in | 6/26/2003 | 6/27/2003 | 6/26/2003 | A | CANC |
Carl Dependahl
|
|
|
scott
|
BLD-Framing/Rough-in | 6/26/2003 | 6/26/2003 | 6/26/2003 | A | FAIL |
Carl Dependahl
|
|
|
keep c/n, wip
|
BLD-Framing/Rough-in | 6/25/2003 | 6/26/2003 | 6/26/2003 | P | NR |
Carl Dependahl
|
|
|
scott...keep c/n, get modification per 6/26/2003 5:27:38 PM mit 6/26/2003 5:28:05 PM walk thru w/ fire insp. 6/26/2003 5:28:36 PM
|
FIRE-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PART |
Rick Jackson
|
|
|
###-#### scott met with carpenter about them wanting to open on 6/27 6/27/2003 11:55:43 AM
|
BLD-Conference | 6/24/2003 | 6/25/2003 | 6/25/2003 | A | NR |
Carl Dependahl
|
|
|
###-#### scott
|
BLD-Conference | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | FAIL |
Carl Dependahl
|
|
|
###-#### scott, c/n issued ...need trade insps, as builts, fireblocking, etc. has plan mod in for review. 6/25/2003 4:28:20 PM
|
BLD-Conference | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | CANC |
Carl Dependahl
|
|
|
SCOTT ###-####
|
BLD-Footing | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | PASS |
Dave Hannah
|
|
|
###-#### aaron four footing in basement engineer has been on site and reviewed changes made becouse of ext footings contractor will get a letter form him on inspection and approval to pour 6/11/2003 11:35:25 AM
|
BLD-Conference | 6/5/2003 | 6/5/2003 | 6/5/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ Riley Mahaffey & John Price re proposed struct change...referred to Westfall... 6/5/2003 3:07:14 PM
|