Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00887
StatusFinaled
Name TRANSPORTATION SECURITY ADMIN.
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(TRANSPORTATION SECURITY ADMINISTRATION - NEW BOISE AIR TERMINAL - 2ND & 3RD FLOORS) This building is fire sprinklered for fire area. To remodel 3 different areas (10,390 square feet total) within the new Boise City Air Terminal for the "Transportation Security Administration". Work is to include interior nonbearing walls, two restroom/locker rooms accessible to the disabled, a folding partition, suspended ceilings, and interior finishes. Existing 1-hr fire-resistance rated corridors are also being modified. All work shall comply with the approved drawings and plan review report on file. The fire sprinkler system, including the location of heads, shall comply with NFPA 13-1999 as regulated by the Fire Deparement. WELDING OF EXISTING STEEL ROOF JOISTS SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS AND SHALL HAVE SPECIAL INSPECTION. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/10/200311/12/200311/12/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/10/2003 at 5:04:11 PM. Contact: ###-####.
Permanent Occupancy 11/12/200311/12/2003 DONE
Details
BLD-Final11/7/200311/10/200311/10/2003ANR
DetailsJim Storey
smoke seals latch adj. ada papper holder. 11/10/2003 4:09:07 PM
BLD-Final11/6/200311/7/200311/7/2003PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/6/2003 at 6:10:37 PM. Contact: ###-####.
FIRE-Final Inspection11/6/200311/7/200311/7/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/6/2003 at 6:09:43 PM. Contact: ###-####.
BLD-Final11/3/200311/3/200311/3/2003PNR
DetailsJim Storey
###-#### fire/mech 11/3/2003 12:31:15 PM
BLD-Conference9/3/20039/4/20039/4/2003APASS
DetailsJim Storey
trd; Phone #: ###-#### Internet Inspection Request from: Annette Moore welding wip reviewed patching of fireproofing. 9/4/2003 8:45:45 AM
BLD-Framing/Rough-in8/25/20038/26/20038/26/2003APASS
DetailsJim Storey
ted; Phone #: ###-#### Internet Inspection Request from: Marc Lileks floor fire stopping ok. 8/26/2003 8:21:22 AM
BLD-Framing/Rough-in8/21/20038/22/20038/22/2003PPART
DetailsJim Storey
ted//before 3:30 please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fire stopping and f/d. 8/22/2003 1:57:31 PM
BLD-Framing/Rough-in8/15/20038/18/20038/18/2003APART
DetailsJim Storey
ted; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fire damper not completed per previous c/n all framing in other areas ok. 8/18/2003 9:52:56 AM
BLD-Framing/Rough-in8/11/20038/12/20038/12/2003APART
DetailsJim Sly
TED; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK'd to cover walls at S.W corner of 3rd floor (TSA) offices....all penitrations at Horiz (2hr) floor assembly firestopped incl HVAC duct penitr....will need to install fire/sm damper in HVAC duct....accessible for verification from 2nd flr...advised to firestop (duct) also from 2nd flr at pan deck......Need listed assembly. 8/12/2003 12:53:23 PM 8/12/2003 12:56:19 PM