BLD-Aging Inspection | 5/11/2009 | 5/11/2009 | 5/19/2009 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/19/2009 | 5/19/2009 | 5/19/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/20/2009 | 2/20/2009 | 2/27/2009 | | PART |
Dave Hannah
|
|
|
waiting for fire
|
BLD-Aging Inspection | 12/5/2008 | 12/5/2008 | 12/9/2008 | | DONE |
Forrest France
|
|
|
Okay for final
|
BLD-Aging Inspection | 9/9/2008 | 9/9/2008 | 9/11/2008 | | CANC |
Forrest France
|
|
|
|
BLD-Aging Inspection | 7/7/2008 | 7/7/2008 | 7/9/2008 | | DONE |
Forrest France
|
|
|
Pending fire sprinkler permit final- verification of system main control valve supervision.
|
FIRE-Final Inspection | 1/24/2008 | 1/25/2008 | 1/30/2008 | A | PART |
Forrest France
|
|
|
Pending verification of a fire alarm supervisory switch at the main control valve for the fire sprinkler system.
|
BLD-Aging Inspection | 1/18/2008 | 1/18/2008 | 1/24/2008 | P | DEFR |
Forrest France
|
|
|
Inspection scheduled.
|
BLD-Aging Inspection | 1/15/2008 | 1/15/2008 | 1/18/2008 | P | DEFR |
Forrest France
|
|
|
Scheduled.
|
BLD-Aging Inspection | 1/15/2008 | 1/15/2008 | 1/18/2008 | | DEFR |
Dave Hannah
|
|
|
needs fire finals sent to fire
|
BLD-Aging Inspection | 10/10/2007 | 10/10/2007 | 10/15/2007 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/10/2007 | 8/10/2007 | 8/14/2007 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2006 | 8/2/2006 | 8/8/2006 | | DEFR |
Forrest France
|
|
|
|
BLD-Aging Inspection | 4/4/2006 | 4/4/2006 | 4/4/2006 | | DEFR |
Dave Hannah
|
|
|
waiting for fire dept sign off
|
BLD-Aging Inspection | 1/16/2006 | 1/16/2006 | 1/18/2006 | | DEFR |
Forrest France
|
|
|
|
BLD-Aging Inspection | 9/28/2005 | 9/28/2005 | 9/30/2005 | | PASS |
Forrest France
|
|
|
waiting on fire
|
BLD-Aging Inspection | 7/7/2005 | 7/7/2005 | 7/8/2005 | | DONE |
Forrest France
|
|
|
Left message with Dennis at ###-#### for requirements to final this permit.
|
FIRE-Final Inspection | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | FAIL |
Troy Cobbley
|
|
|
Contact: ###-####. Inspection was a conference to see what items are needed for a final. Dennis is to provide verification that min control valve for the fire sprinkler system is monitored by the fire alarm system
|
BLD-Aging Inspection | 4/27/2005 | 4/27/2005 | 4/28/2005 | | NR |
Troy Cobbley
|
|
|
I spoke to Dennis. He is going to call in an inspection to go over all outstanding issues.
|
BLD-Aging Inspection | 9/17/2004 | 9/17/2004 | 9/17/2004 | | PASS |
Rick Jackson
|
|
|
contractor out of town until october 2nd 9/17/2004 9:34:08 AM
|
BLD-Aging Inspection | 7/13/2004 | 7/13/2004 | 7/13/2004 | | PART |
Rick Jackson
|
|
|
Talked to Dennis and he will get the inspections called as the fire alarm panel has been installed and sprinkler system has received an annual inspection 7/13/2004 4:13:01 PM
|
BLD-Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PART |
Carl Dependahl
|
|
|
ok for t/o...need fire ok 8/1/2003 2:14:45 PM
|
BLD-Final | 7/30/2003 | 7/31/2003 | 7/31/2003 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 12:57:21 PM. Contact: ###-####.
|
FIRE-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PART |
Troy Cobbley
|
|
|
Fire alarm and fire life safety given a temporary occupancy per Dave Miller until the main control vavle has been supervised by the fire alarm system. This will require city approved drawings. Contractor still needs to provide the annual inspection report so any other major issues can be addressed 7/31/2003 9:51:07 AM
|
BLD-Conference | 7/18/2003 | 7/21/2003 | 7/21/2003 | A | PASS |
Carl Dependahl
|
|
|
dennis ###-####..rec'd concrete test report from Strata, ok. 7/21/2003 4:09:24 PM
|
BLD-Framing/Rough-in | 7/21/2003 | 7/21/2003 | 7/21/2003 | P | PASS |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 1:32:16 PM. ..walls ok 7/21/2003 1:32:53 PM
|
BLD-Framing/Rough-in | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 1:10:22 PM. Contact: ###-####....need actual spec insp data 7/16/2003 10:24:42 AM
|
BLD-Concrete | 6/19/2003 | 6/20/2003 | 6/20/2003 | P | CANC |
Carl Dependahl
|
|
|
lintel
|
BLD-Concrete | 6/19/2003 | 6/19/2003 | 6/19/2003 | P | NR |
Carl Dependahl
|
|
|
|
BLD-Conference | 6/18/2003 | 6/19/2003 | 6/19/2003 | A | CANC |
Carl Dependahl
|
|
|
Dennis
|
BLD-Conference | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PASS |
Carl Dependahl
|
|
|
need spec insp for lintel...5000psi concrete spec'd. 6/18/2003 3:50:16 PM
|
BLD-Concrete | 6/16/2003 | 6/17/2003 | 6/17/2003 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 6/16/2003 at 4:44:48 PM. Contact: ###-####.
|