DOC - Permit Expired | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | PASS |
Jim Sly
|
|
|
Fire finaled/ struct OK for final............no permits tied to this case to verify finals (Plumb & HVAC) Going to Exp.
|
FIRE-Final Inspection | 4/6/2004 | 4/6/2004 | 4/6/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Framing/Rough-in | 1/22/2004 | 1/23/2004 | 1/23/2004 | A | PART |
Jim Sly
|
|
|
dennis-t grid insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Grid OK. 1/23/2004 11:06:31 AM
|
BLD-Final | 12/19/2003 | 12/22/2003 | 12/22/2003 | A | FAIL |
Jim Sly
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Darla Downs Need at least a temp occ.from plumb and hvac before temp from structural. 12/22/2003 8:31:05 AM
|
BLD-Final | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | NR |
Russ Owen
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. needs fire / life safety prior to final bld. 12/19/2003 10:43:54 AM
|
FIRE-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | PART |
Troy Cobbley
|
|
|
Temp occupancy given until the fire alarm and fire sprinklers are finaled
|
BLD-Framing/Rough-in | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | PASS |
Jim Sly
|
|
|
Dennis --- T grid; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/16/2003 10:19:55 AM
|
FIRE-Conference | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | DONE |
Troy Cobbley
|
|
|
I spoke with dave miller and he said that he would be ok with a temp. occupancy on the shell core so that the check cashing place can open as long as the fire sprinkler system was operational. The alarm system drawings are being reviewed at this time 12/10/2003 12:31:25 PM
|
BLD-Conference | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | PART |
Jim Sly
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 12/9/2003 9:31:36 AM 12/9/2003 10:21:53 AM Met with Dennis and rep from DBSI .....advised to have Conf insp with Fire and Code inforcement (p&z) For requirements to allow for finals on Shell/Core. The property line issue has been resolved, approved by Tim Hogland, and has been Recorded. 12/9/2003 12:22:57 PM 12/9/2003 12:26:59 PM
|
BLD-Conference | 12/5/2003 | 12/8/2003 | 12/8/2003 | A | PART |
Jim Sly
|
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs Discussed property line. 12/8/2003 11:24:07 AM
|
BLD-Conference | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | CANC |
Jim Sly
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 10/7/2003 | 10/7/2003 | 10/7/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/7/2003 at 6:37:02 AM. Contact: ###-####. Inspected roof Gables too....OK. 10/7/2003 10:47:03 AM
|
BLD-Conference | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | PART |
Jim Sly
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Warned of property line at East side to be moved prior to any Occupancy. Engineer of record to be reviewing special insp reports for conc, welding, epoxy, etc. Will Req final letter from Eng. E wall OK to cover. 9/3/2003 9:29:29 AM
|
BLD-Foundation | 8/4/2003 | 8/5/2003 | 8/5/2003 | A | PART |
Jim Sly
|
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs Footing for columns and beam W wall MTI on site. 8/5/2003 12:59:06 PM
|
BLD-Footing | 7/31/2003 | 7/31/2003 | 7/31/2003 | P | PART |
Jim Sly
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore MTI on site 7/31/2003 4:03:33 PM
|
BLD-Foundation | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PASS |
Steven Webb
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 7/2/2003 | 7/3/2003 | 7/3/2003 | P | PART |
Dave Hannah
|
|
|
###-#### dennis all but three perm ftgs ok to pour 7/3/2003 3:46:32 PM
|