BLD-Final | 10/1/2003 | 10/3/2003 | 10/3/2003 | A | PASS |
Jim Storey
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore final ok card on site. 10/3/2003 10:39:49 AM
|
Permanent Occupancy | | 10/3/2003 | 10/3/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PART |
Dave Hannah
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore ceiling grid needs spreader bars 10/1/2003 12:41:47 PM
|
FIRE-Final Inspection | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PASS |
Rick Jackson
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore GC will have door hardware and smoke seal for structural inspector as it was just painted; penetrations in corridor wall require fire stopping 10/1/2003 3:02:08 PM
|
FIRE-Final Inspection | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | FAIL |
Rick Jackson
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie penetrations reuire fire stopping; duct opening in corridor wall requires smoke/fire damper with detection to operate damper; hang fire extinguisher 9/25/2003 4:06:41 PM
|
BLD-Framing/Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PART |
Carl Dependahl
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok to cover walls, patch floor/clg & walls for 1hr const as req'd...continuous gypsum req'd 8/8/2003 2:51:14 PM
|
BLD-Conference | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | PASS |
Carl Dependahl
|
|
|
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...1hr bldg, need patch gyp & firestop penetrations...may req fire damper at exh duct. ok to cover int partitions pending elec/plbg 8/6/2003 12:03:23 PM
|