Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-01060
StatusFinaled
Name DR DAVID MUNRO DDS
Site Address 222 N 2ND ST Unit: STE 303
Project NameANDERSON PLAZA
Customer Number 
ePlanReviewNo
Description
(DR DAVID MUNRO DDS - 3RD FLOOR) This building is NOT fire sprinklered. To remodel an existing 1,330 square foot office tenant space located on the 3rd floor of "Anderson Plaza Medical Building". Work is to include a restroom accessible to the disabled, interior nonbearing walls, millwork, interior finishes, and suspended ceilings all per approved drawings and plan review conditions on file. The existing 1-hr corridor shall be maintained. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/1/200310/3/200310/3/2003APASS
DetailsJim Storey
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore final ok card on site. 10/3/2003 10:39:49 AM
Permanent Occupancy 10/3/200310/3/2003 DONE
Details
BLD-Framing/Rough-in9/30/200310/1/200310/1/2003APART
DetailsDave Hannah
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore ceiling grid needs spreader bars 10/1/2003 12:41:47 PM
FIRE-Final Inspection9/30/200310/1/200310/1/2003APASS
DetailsRick Jackson
larry; Phone #: ###-#### Internet Inspection Request from: Annette Moore GC will have door hardware and smoke seal for structural inspector as it was just painted; penetrations in corridor wall require fire stopping 10/1/2003 3:02:08 PM
FIRE-Final Inspection9/25/20039/25/20039/25/2003PFAIL
DetailsRick Jackson
larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie penetrations reuire fire stopping; duct opening in corridor wall requires smoke/fire damper with detection to operate damper; hang fire extinguisher 9/25/2003 4:06:41 PM
BLD-Framing/Rough-in8/8/20038/8/20038/8/2003PPART
DetailsCarl Dependahl
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok to cover walls, patch floor/clg & walls for 1hr const as req'd...continuous gypsum req'd 8/8/2003 2:51:14 PM
BLD-Conference8/5/20038/6/20038/6/2003APASS
DetailsCarl Dependahl
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...1hr bldg, need patch gyp & firestop penetrations...may req fire damper at exh duct. ok to cover int partitions pending elec/plbg 8/6/2003 12:03:23 PM