Permit Information
Permit NumberBLD03-01107
StatusFinaled
Name PINE CREEK DEVELOPMENT
Site Address 6305 W OVERLAND RD
Project NameInterchange Sub #1
Customer Number 
ePlanReviewNo
Description
(Pacific Republic Mortgage) To construct a new 7100 sq. ft., one story, wood framed office building and related site improvements. This building will be fully fire sprinklered. All construction per the approved plans and attached comment list. DRH03-00035, CUP03-00014, PC#277-03/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/6/20044/6/2004 DONE
Details
BLD-Final4/1/20044/2/20044/2/2004APASS
DetailsRuss Owen
Georeg insp 305 Meet with builder and approved grab bars as they are close only3/16 in out and to resolve the toilets would have to be removed , this hardship and in the future they will use a different toilet. 4/1/2004 7:00:14 PM Ok for a perm oc. 4/1/2004 7:00:29 PM
BLD-Final3/17/20043/18/20043/18/2004AFAIL
DetailsRuss Owen
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Posted c/n on front window same c/n. grab bars. 3/18/2004 1:24:52 AM
BLD-Final3/16/20043/16/20043/16/2004PFAIL
DetailsRuss Owen
Glen; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes prior c/n grab bars 1-1/2 clearance at lids contractor on site notified. 3/15/2004 11:46:54 PM
FIRE-Final Inspection3/15/20043/15/20043/15/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final1/8/20041/9/20041/9/2004PCANC
DetailsRuss Owen
Glen.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final1/6/20041/9/20041/9/2004APART
DetailsRuss Owen
OK, TEMP OC PENDING A C/N 1/9/2004 12:20:26 PM
FIRE-Final Inspection1/9/20041/9/20041/9/2004APART
DetailsTroy Cobbley
A temporary occupancy was given until the fire alarm plans have been resubmitted showing the access control connected to the fire alarm. All other fire alarm devices have been tested. Fire life safety items are ok. I notified the contractor that painting the curbing for fire dept access will become an issue when the next building is built.
FIRE-Alarm Testing1/6/20041/8/20041/8/2004AFAIL
DetailsTroy Cobbley
No approved plans on site 1/8/2004 11:35:39 AM
FIRE-Final Inspection1/6/20041/8/20041/8/2004AFAIL
DetailsTroy Cobbley
###-#### GLENN No approved plans on site 1/8/2004 11:36:07 AM
FIRE-Supply Line Hydro1/6/20041/8/20041/8/2004AFAIL
DetailsTroy Cobbley
No approved plans on site 1/8/2004 11:35:45 AM
Code Occupancy Approval Temp  1/8/2004 DON
BOND IN PLACE FOR LANDSCAPE AND DUMPSTER AREA SCREENING FOR $4785.OO SO I SIGNED TEMP OCCUPANCY
BLD-Energy code compliance10/17/200310/20/200310/20/2003APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/17/2003 at 4:24:22 PM. Contact: ###-####. Ok leter from architect with reference to insulation change. 10/20/2003 11:46:37 AM
BLD-Energy code compliance10/13/200310/14/200310/14/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/13/2003 at 1:22:58 PM. Contact: ###-####. Need detail from architect for insulation in attic area. Called contractor. 10/14/2003 5:02:36 PM
BLD-Framing/Rough-in10/13/200310/14/200310/14/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/13/2003 at 1:22:06 PM. Contact: ###-####. allready done. 10/13/2003 10:22:06 PM
BLD-Framing/Rough-in9/24/20039/26/20039/26/2003APASS
DetailsRuss Owen
BLD-Framing/Rough-in9/25/20039/25/20039/25/2003PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/25/2003 at 8:15:15 AM. Contact: ###-####.
BLD-Framing/Rough-in9/22/20039/22/20039/22/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/22/2003 at 8:42:10 AM. Contact: ###-####. posted c/n 9/23/2003 12:45:00 AM
BLD-Wall cover9/22/20039/22/20039/22/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/22/2003 at 8:19:25 AM. Contact: ###-####.ok to side 9/23/2003 12:44:50 AM
BLD-Conference9/17/20039/19/20039/19/2003PPART
DetailsRuss Owen
Please meet with Jed and project engineer at 2:00pm with engineer. 9/17/2003 11:32:27 PM Went over job with engineer on site clairified items missing from approved plans. 9/19/2003 12:19:14 AM
BLD-Wall cover9/17/20039/17/20039/17/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/17/2003 at 9:26:32 AM. Contact: ###-####. I have posted a c/n for a meeting with the project engineer and builder. callede and left message with builder.9/16/2003 10:00:07 PM 9/16/2003 10:01:19 PM
BLD-Foundation7/23/20037/23/20037/23/2003PPASS
DetailsRuss Owen
STEVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing7/21/20037/22/20037/22/2003APASS
DetailsRuss Owen
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore