BLD-Final | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | PASS |
Tom Arcoraci
|
|
|
Bob, ###-#### - please call him 1st so he knows you're going out. I have the sign off card & everyone has signed off for final. Thanks, Russ!
|
Permanent Occupancy | | 4/22/2004 | 4/22/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 4/20/2004 | | PASS |
|
|
|
The required CU has been applied for the storage of dirt off sight so I signed off the final occupancy ref, CUP04-00036
|
FIRE-Final Inspection | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | PASS |
Troy Cobbley
|
|
|
fire lfie safety finaled 10/15/2003 11:37:58 PM
|
FIRE-Final Inspection | 2/12/2004 | 2/12/2004 | 2/12/2004 | P | FAIL |
Troy Cobbley
|
|
|
Door hardware issues still need addressed. Provide labels on the electrical panels. Provide map at the facp annunciator. Provide "No Parking - Fire Lane" text on red curbing
|
BLD-Final | 2/3/2004 | 2/4/2004 | 2/4/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/3/2004 at 2:34:39 PM. Contact: ###-####. Ok temp co, c/n posted for items. 2/4/2004 5:23:06 PM
|
BLD-Final | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/3/2004 at 4:42:04 PM. Contact: ###-####.
|
FIRE-Final Inspection | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | PART |
Troy Cobbley
|
|
|
Fire life safety given a temporary occupancy until the fire alarm resubmittals have been approved and the alarm system tested. The sprinkler system was given a temp until the fire alarm is tested as well 2/4/2004 9:55:43 AM
|
BLD-Final | 2/3/2004 | 2/3/2004 | 2/3/2004 | P | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/3/2004 at 10:37:36 AM. Contact: ###-####.
|
FIRE-Conference | 2/3/2004 | 2/3/2004 | 2/3/2004 | P | DONE |
Troy Cobbley
|
|
|
Fire life safety items are ok when the fire sprinklers and fire alarm are finaled
|
BLD-Conference | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | DONE |
Troy Cobbley
|
|
|
Went over life safety issues and notes with the general contractor. I looks like they need a racking permit
|
Code Occupancy Approval Temp | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | DONE |
Scott M.Brown
|
|
|
SIGNED TEMP OCCUPANCY BECAUSE Z.C. ISSUED FOR THE DIRT PILE ON LOT NEXT DOOR (7849 GRANTZ) WILL SIGN FINAL WHEN CONDITIONAL USE PERMIT FILED FOR 2/2/2004 2:06:46 PM
|
BLD-Conference | 1/28/2004 | 1/28/2004 | 1/28/2004 | P | PART |
Russ Owen
|
|
|
went over break room counters will be cut down. 1/29/2004 1:50:03 PM
|
BLD-Conference | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 4:38:52 PM. Contact: ###-####. Ceiling grid ok,have details from architect. also talked about access for sinks. 1/27/2004 4:42:32 PM
|
Code Occupancy Approval Temp | | | 1/27/2004 | | FAIL |
|
|
|
TO BOND OR REMOVE THE DIRT REMOVED FROM THIS LOCATION PLACED ON VACANT LOT LOCATED JUST WEST OF SITE, ADDRESS 7849 GRATZ, MAY OBTAIN SOME TYPE OF ZOING APPROVAL. NEEDS THIS DONE TO SIGN TEMP OCCUPANCY
|
BLD-Other | 1/23/2004 | 1/23/2004 | 1/23/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/23/2004 at 10:21:04 AM. Contact: ###-####. needs lights tied up a letter from architect for ceiling 1/23/2004 2:55:43 PM
|
BLD-Other | 1/21/2004 | 1/22/2004 | 1/22/2004 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/21/2004 at 4:09:50 PM. Contact: ###-####. ceiling grid c/n posted. 1/22/2004 1:02:12 PM
|
BLD-Energy code compliance | 12/11/2003 | 12/12/2003 | 12/12/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/11/2003 at 4:50:39 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/11/2003 | 12/12/2003 | 12/12/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/11/2003 at 4:51:18 PM. Contact: ###-####. ok all walls. 12/12/2003 10:19:09 AM
|
BLD-Energy code compliance | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 1:45:53 PM. Contact: ###-####.
|
BLD-Energy code compliance | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Russ Owen
|
|
|
Ok pending new com check report. 12/9/2003 2:17:29 PM
|
BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 1:45:10 PM. Contact: ###-####.
|
BLD-Energy code compliance | 12/5/2003 | 12/5/2003 | 12/5/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 7:15:26 AM. Contact: ###-####. will be back to check allwork after completion partial only Architect has a new report to submit showing insulation values as on plans r-15 wall report shows r-21. does not match plans typicall. 12/5/2003 12:30:12 PM
|
BLD-Energy code compliance | 12/5/2003 | 12/5/2003 | 12/5/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 7:16:10 AM. Contact: ###-####. lower wall ok. 12/5/2003 3:40:14 PM
|
BLD-Framing/Rough-in | 12/2/2003 | 12/3/2003 | 12/3/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/2/2003 at 4:48:50 PM. Contact: ###-####. Need to putty pad boxes in 2 hr wall. ok to insulate exterior and complete drywall at all other interior locations .contractor on site . 12/3/2003 2:23:56 PM
|
BLD-Framing/Rough-in | 11/24/2003 | 11/25/2003 | 11/25/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/24/2003 at 4:23:57 PM. Contact: ###-####. Out of Time. 11/24/2003 10:37:38 PM
|
BLD-Framing/Rough-in | 11/24/2003 | 11/25/2003 | 11/25/2003 | P | PART |
Russ Owen
|
|
|
Need to build the 2 hr celings at locations shown on plans also at stair enclosure the walls will need to go to roof deck, needs plumbing approved and insulation inspection ok to rock 1 side only Bob with Russell corp on site and will resolve. 11/24/2003 10:37:04 PM
|
BLD-Framing/Rough-in | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/4/2003 at 4:04:15 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | PART |
Russ Owen
|
|
|
Ok to complete above roof area. 11/5/2003 12:47:54 AM
|
BLD-Framing/Rough-in | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/31/2003 at 8:43:57 AM. Contact: ###-####. north west exterior walls ok to cover. 10/31/2003 1:56:45 PM
|
BLD-Framing/Rough-in | 10/20/2003 | 10/21/2003 | 10/21/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/20/2003 at 11:45:17 AM. Contact: ###-####. 10/20/2003 7:53:39 PM
|
BLD-Footing | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 1:33:01 PM. Contact: ###-####.Ok pending special inspection approval. 7/28/2003 12:05:44 PM
|
BLD-Energy code compliance | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/24/2003 at 4:31:29 PM. Contact: ###-####. OK R-10 insul at (CMU area) foundation wall. 7/25/2003 10:32:01 AM
|
BLD-Footing | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 9:18:08 AM. Contact: ###-####.. out of time recalled. 7/18/2003 12:20:44 PM
|
BLD-Footing | 7/18/2003 | 7/18/2003 | 7/18/2003 | P | PART |
Russ Owen
|
|
|
ok MTI will inspect. 7/18/2003 3:18:44 PM
|