BLD-Conference | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
|
DOC - Permit Finaled | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Tony Young
|
|
|
should have been doc finaled
|
BLD-Final | 3/17/2005 | 3/18/2005 | 3/18/2005 | A | PASS |
Dave Hannah
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Jan Rice cc issued by 415 3/18/2005 8:32:28 AM
|
BLD-Grading Inspection | 3/17/2005 | 3/17/2005 | 3/17/2005 | | DONE |
|
|
|
final grading and drainage approved
|
BLD-Final | 3/11/2005 | 3/11/2005 | 3/14/2005 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
Hillside requirements not complete.
|
BLD-Final | 3/8/2005 | 3/10/2005 | 3/10/2005 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
needs hillside sign off 1st 3/11/2005 9:16:07 AM
|
BLD-Energy code compliance | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Jim Sly
|
|
|
janet; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Jim Sly
|
|
|
janet; Phone #: ###-#### Internet Inspection Request from: Jan Rice Owner has copy of shear approval by engineer. 1/26/2005 10:14:34 AM
|
BLD-Framing/Rough-in | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PART |
Tony Young
|
|
|
PLEASE CALL ROB WITH ANY QUESTIONS ###-####; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
seal around tub drains,,, fireblock ceiling lines,,, ok to insulate 1/20/2005 11:48:47 AM
|
BLD-Framing/Rough-in | 1/18/2005 | 1/19/2005 | 1/19/2005 | A | FAIL |
Troy James
|
|
|
Please call Rob w/questions ###-####; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
Need approved set of plans, seal package done, no shear inspection done, need letter from engineer approving shear. 1/19/2005 11:27:38 AM
|
BLD-Foundation | 11/9/2004 | 11/10/2004 | 11/10/2004 | A | PART |
Tony Young
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Jan Rice
wip,, need to add more rebar in some areas 11/10/2004 10:35:52 AM
|
BLD-Footing | 11/4/2004 | 11/4/2004 | 11/4/2004 | P | PART |
Tony Young
|
|
|
###-####
basement ftgs,, wip 11/4/2004 3:26:27 PM
|
BLD-Grading Inspection | 10/11/2004 | 10/11/2004 | 10/11/2004 | | DONE |
|
|
|
Received footing subgrade approval for lower retaining wall
|
BLD-Foundation | 10/7/2004 | 10/7/2004 | 10/7/2004 | A | CANC |
Dave Hannah
|
|
|
second level retianning wall ok to pour
|
BLD-Wall cover | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | NR |
Dave Hannah
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 10/4/2004 | 10/5/2004 | 10/5/2004 | A | PART |
Tom Arcoraci
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles lower retain wall wip ok 10/5/2004 9:08:58 AM
|
BLD-Footing | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | NR |
Tony Young
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Concrete | 9/15/2004 | 9/16/2004 | 9/16/2004 | A | PART |
Troy James
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to place concrete to upper retaining wall. 9/16/2004 10:21:10 AM
|
BLD-Footing | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | PART |
Tony Young
|
|
|
ED; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
upper retaining wall ftgs,, wip 9/14/2004 11:46:09 AM
|
BLD-Grading Inspection | 9/14/2004 | 9/14/2004 | 9/14/2004 | | DONE |
|
|
|
Footing subgrade for retaining wall has been approved by the geotechnical engineer.
|
BLD-Footing | 9/13/2004 | 9/13/2004 | 9/13/2004 | P | CANC |
Dave Hannah
|
|
|
ED; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|