Permanent Occupancy | | 3/30/2004 | 3/30/2004 | | DONE |
|
|
|
|
BLD-Final | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PART |
Jim Sly
|
|
|
RON; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Temp Occ. Need Perm Occ status from Electr.......After Electr final for Perm, OK for Perm Occ On structural. C/N Obtain Perm Occ status within 90 days of this notice. 11/26/2003 8:57:29 AM 11/26/2003 8:57:54 AM
|
BLD-Final | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | NR |
Jim Sly
|
|
|
ron ###-#### Need signatures from ACHD Public works and code enforc....... 11/25/2003 1:17:26 PM
|
FIRE-Final Inspection | 11/25/2003 | 11/25/2003 | 11/25/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety ok
|
Code Occupancy Approval | | | 11/25/2003 | | PASS |
|
|
|
LOOKS OK FINAL SIGNED OFF.
|
FIRE-Final Inspection | 11/21/2003 | 11/24/2003 | 11/24/2003 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguishers and final fire alarm system 11/24/2003 12:26:08 PM
|
BLD-Framing/Rough-in | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | PASS |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Darla Downs All framing and shear panels...OK 9/29/2003 4:06:11 PM
|
BLD-Framing/Rough-in | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | PART |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Darla Downs inspection of metal studs (12" O.C.) at perimeter (shear) walls of Mezzanine....OK to sheath. 9/24/2003 8:38:10 AM
|
BLD-Foundation | 7/14/2003 | 7/15/2003 | 7/15/2003 | A | PASS |
Dave Hannah
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows strata on site testing concrete i also checked rebar all looked good 7/15/2003 12:29:54 PM
|
BLD-Footing | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PART |
Russ Owen
|
|
|
GAIL- ###-#### footings in place and Strata will be performing special inspection.11/2003 11:14:43 AM 7/11/2003 11:15:23 AM
|