BLD-Other | 6/30/2004 | 7/6/2004 | 7/6/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/30/2004 at 2:21:04 PM. Contact: ###-####. C/C issued. 7/6/2004 11:39:28 AM
|
FIRE-Final Inspection | 5/19/2004 | 5/19/2004 | 5/19/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 5/19/2004 3:09:27 PM
|
FIRE-Final Inspection | 4/22/2004 | 4/22/2004 | 4/22/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide maximum storage height designation of 18' for the racks. Provide transverse flu space of 6" per review notes
|
FIRE-Final Inspection | 9/30/2003 | 9/30/2003 | 9/30/2003 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Other | 9/4/2003 | 9/5/2003 | 9/5/2003 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 8:00:13 AM. Contact: ###-####. Need Electr final if applicable....Need fire approval prior to calling for struct insp.....Notified Contractor/owner. 9/5/2003 12:06:54 PM
|