Permit Information
Permit NumberBLD03-01377
StatusFinaled
Name SCOTT M FREEMAN
Site Address 1435 S MAPLE GROVE RD
Project NameIdaho Athletic Club
Customer Number 
ePlanReviewNo
Description
Idaho Athletic Club - To construct a new 28,600 square foot, 2-story athletic club and related site improvements. This building contains a basketball court, swimming pool, exercise areas, locker rooms and accessory support areas. This building is constructed of reinforced concrete masonry block exterior walls with interior steel structural frame, concrete floors and metal roof deck. This building is fully fire sprinklered. All construction per the approved plans and attached comment list. DRH03-00071/CUP03-00023/PC#340-03/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/1/20043/3/20043/3/2004PPASS
DetailsRuss Owen
dan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Ok for a perm oc. 3/2/2004 10:08:04 PM
Permanent Occupancy 3/3/20043/3/2004 DONE
Details
BLD-Final2/18/20042/18/20042/18/2004PFAIL
DetailsRuss Owen
dan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore. called and left a message with dan, bottom handrails ext do not comply in exit tower. 2/18/2004 12:37:36 AM
BLD-Final2/2/20042/2/20042/2/2004PPART
DetailsJim Storey
Gary; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n made ok arch letter in your box/ handraillins missing back west stair wall mounts. 2/2/2004 4:03:49 PM
FIRE-Final Inspection1/8/20041/9/20041/9/2004AFAIL
DetailsTroy Cobbley
need alarm reports and could not test elevators 1/9/2004 10:31:52 AM
FIRE-Final Inspection1/9/20041/9/20041/9/2004PPASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinkler are finaled 1/9/2004 2:18:15 PM
BLD-Final1/7/20041/8/20041/8/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/7/2004 at 4:03:10 PM. Contact: ###-####. issued a c/n ok for temp oc . 1/8/2004 5:05:48 PM
FIRE-Final Inspection1/7/20041/8/20041/8/2004APART
DetailsTroy Cobbley
A temporary occupancy was given until the elevator has been tested, knox box is provided, signage per review note #33, remove plumbing pipe from sprinkler line at riser, provide address and paint curbing for fire dept access. Need NFPA 72 forms and monitoring verification 1/8/2004 10:06:42 AM
BLD-Framing/Rough-in12/29/200312/30/200312/30/2003AFAIL
DetailsRuss Owen
cell ###-#### 12/29/2003 3:43:53 PM > this needs penetrations of 1 hr walls completed. also went over this with contractor. 12/30/2003 12:08:57 PM
BLD-Other12/29/200312/29/200312/29/2003PNH
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/29/2003 at 9:13:49 AM. Contact: ###-####. Called contractor unable to locate at job , need to meet with cont for this insp. 12/29/2003 3:39:40 PM
BLD-Framing/Rough-in12/10/200312/11/200312/11/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/10/2003 at 10:24:25 AM. Contact: ###-####. Got letter from architect no 1 hr shaft needed at ducts through floor as long as they are sealed tight which they are. Need narchitect to clairify insulation at exterior walla some not contionous contractor notified and will address soon 2 days. 12/11/2003 11:45:38 AM
BLD-Framing/Rough-in12/3/200312/3/200312/3/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/3/2003 at 8:08:10 AM. Contact: ###-####. need to complete the 1 hr walls and shafts at second floor also shafts will need to be addressedas to how they will be built as offsets exist contractor on site notified. 12/4/2003 1:54:00 PM
BLD-Framing/Rough-in11/18/200311/20/200311/20/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/18/2003 at 4:24:29 PM. Contact: ###-####. 1st floor framing minus elevator shaft OK 11/20/2003 5:05:55 PM
BLD-Framing/Rough-in11/14/200311/19/200311/18/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/14/2003 at 4:56:44 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 18 2003 4:27PM.
BLD-Footing9/15/20039/15/20039/15/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/15/2003 at 8:47:51 AM. Contact: ###-####. subject to s-i. 9/15/2003 12:38:52 AM
BLD-Foundation9/4/20039/5/20039/5/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/4/2003 at 8:44:54 AM. Contact: ###-####. ok subject to s-i. 9/4/2003 7:58:39 PM 9/4/2003 7:58:43 PM
BLD-Foundation9/4/20039/4/20039/4/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/4/2003 at 8:44:15 AM. Contact: ###-####. ok subject to s-i. 9/4/2003 12:28:49 AM
BLD-Foundation8/28/20038/29/20038/29/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/28/2003 at 1:49:16 PM. Contact: ###-####.
BLD-Foundation8/26/20038/27/20038/27/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/26/2003 at 2:32:41 PM. Contact: ###-####.subject to special inspection. 8/28/2003 9:37:42 AM
BLD-Footing8/25/20038/26/20038/26/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/25/2003 at 9:18:48 AM. Contact: ###-####. Subject to s-i. 8/28/2003 12:17:27 PM
BLD-Footing8/21/20038/21/20038/21/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/21/2003 at 8:34:33 AM. Contact: ###-####.