BLD-Final | 12/14/2005 | 12/15/2005 | 12/15/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/14/2005 at 2:15:40 PM. Contact: ###-####. OK for perm occ ():
|
Permanent Occupancy | | 12/15/2005 | 12/15/2005 | | DONE |
|
|
|
|
BLD-Final | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 1:40:32 PM. Contact: ###-####. Need Final affidavit from MTI
|
FIRE-Final Inspection | 8/11/2005 | 8/12/2005 | 8/12/2005 | A | PASS |
Troy Cobbley
|
|
|
rick ; Phone #: ###-#### Permit finaled. Per Rick the materials passed through the building and contained inside do not meet the definitions of hazardous materials per the msds sheets.
|
FIRE-Final Inspection | 8/4/2005 | 8/5/2005 | 8/5/2005 | A | FAIL |
Troy Cobbley
|
|
|
rick; Phone #: ###-#### No approved plans or notes on site. I talked to Rick about fire extinguisher requirements.
|
Code Occupancy Approval | | | 8/5/2005 | | PASS |
|
|
|
|
BLD-Conference | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/19/2005 at 9:59:02 AM. Contact: ###-####. Discusses stairways handrails etc with Rick. 1/20/2005 11:29:08 AM
|
BLD-Conference | 12/3/2004 | 12/6/2004 | 12/6/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/3/2004 at 1:45:25 PM. Contact: ###-####.
|
BLD-Conference | 10/21/2004 | 10/25/2004 | 10/25/2004 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/21/2004 at 9:44:54 AM. Contact: ###-####. Met with Rick C. Talked about Special insp and tests from MTI. Rick and Engineer of record have been reviewing Special insp reports.....so far there have been no descrepancies.....Looked at Control Bldg....OK to insulate and Side (steel) Need to have plumbing and HVAC inspection on control Bldg. 10/25/2004 11:15:56 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PART |
Jim Sly
|
|
|
WIP 8/4/2004 6:22:54 PM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PART |
Jim Sly
|
|
|
WIP 8/4/2004 6:22:38 PM
|
BLD-Wall cover | 4/13/2004 | 4/13/2004 | 4/13/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/13/2004 at 7:46:09 AM. Starting CMU walls... MTI on site for special insp. 4/13/2004 4:07:23 PM 4/13/2004 4:16:56 PM
|
BLD-Concrete | 3/10/2004 | 3/10/2004 | 3/10/2004 | P | PART |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Darla Downs PLEASE CALL FIRST 3/10/2004 4:09:21 PM E. wall of main Bldg. OK Pend tests and approvals for compression. 3/10/2004 4:36:45 PM
|
BLD-Concrete | 2/18/2004 | 2/19/2004 | 2/19/2004 | A | PART |
Jim Sly
|
|
|
###-#### Rick Wall insp. 2/19/2004 12:21:44 PM
|
BLD-Concrete | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | PART |
Tom Arcoraci
|
|
|
wip spec insp 12/19/2003 8:27:46 AM
|
BLD-Concrete | 11/28/2003 | 12/1/2003 | 12/1/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/28/2003 at 3:40:02 PM. 1st approx 4' of walls OK pending special insp. reports and approvals. 12/1/2003 11:11:23 AM
|
BLD-Foundation | 11/13/2003 | 11/14/2003 | 11/14/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/13/2003 at 11:44:47 AM. Contact: ###-####. Talked with George about approval of Rick Cummings, a Public Works employee, as a reinforced concrete (special) inspector for this project. George OK'd. We have Boise City structural inspections and third party inspections from MTI for test samples and all req (other) special inspections for project. I verified Rick's certification for reinforced concrete.... ICC # XX4141006233. Footing OK pending special insp reports and approvals. 11/14/2003 10:29:46 AM 11/14/2003 10:33:57 AM
|
BLD-Conference | 11/5/2003 | 11/12/2003 | 11/12/2003 | P | PASS |
Jim Sly
|
|
|
###-#### Craig; Phone #: ###-#### x3684 Internet Inspection Request from: Aimee Hughes Met with Craig and Rick Cummings......discussion of special insp req. and proceedures. 11/12/2003 4:06:29 PM
|