BLD-Final | 8/4/2003 | 8/5/2003 | 8/5/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 11:08:00 AM. Contact: ###-####. Ok for a perm oc. 8/5/2003 10:04:07 AM
|
Permanent Occupancy | | 8/5/2003 | 8/5/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/4/2003 | 8/4/2003 | 8/4/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 8/4/2003 3:43:57 PM
|
FIRE-Alarm Testing | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | FAIL |
Troy Cobbley
|
|
|
fire alarm system failed. Provide map at the facp and signage on the riser room door. When the fire alarm is ready to go all life safety items are ok 8/1/2003 11:33:21 AM 8/1/2003 11:35:33 AM
|
FIRE-Final Inspection | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | FAIL |
Troy Cobbley
|
|
|
fire alarm system failed. Provide map at the facp and signage on the riser room door. When the fire alarm is ready to go all life safety items are ok 8/1/2003 11:33:21 AM 8/1/2003 11:35:24 AM
|
BLD-Other | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/22/2003 at 7:06:55 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PASS |
Russ Owen
|
|
|
Mike ###-####
|