BLD-Final | 9/2/2003 | 9/2/2003 | 9/2/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 9:07:59 AM. Contact: ###-####.final ok
9/2/2003 3:15:55 PM
|
Permanent Occupancy | | 9/2/2003 | 9/2/2003 | | DONE |
|
|
|
|
BLD-Final | 8/28/2003 | 8/29/2003 | 8/29/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 3:47:09 PM. Contact: ###-####. dead bolt door 8. 8/29/2003 3:25:59 PM
|
FIRE-Final Inspection | 8/28/2003 | 8/29/2003 | 8/29/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 3:46:36 PM. Contact: ###-####. will have the key lock removed from double door for structrual inspector; detectors okay for AHU shutdown 8/29/2003 1:43:37 PM
|
BLD-Final | 8/18/2003 | 8/19/2003 | 8/19/2003 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 3:17:51 PM. Contact: ###-####.denis called and cancled. 8/19/2003 1:31:52 PM
|
FIRE-Final Inspection | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 3:16:19 PM. Contact: ###-####. door #8 must be openable from the inside without special knowledge; need to verify AHU's if they are over 2000 CFM and if so then a duct detector is required for AHU shutdown 8/19/2003 10:26:25 AM
|
BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 8:30:46 AM. Contact: ###-####....brace walls to deck, need elec walls ok 8/8/2003 10:42:31 AM
|