Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01618
StatusFinaled
Name PROCTOR & GAMBLE
Site Address 412 E PARKCENTER BLVD Unit: 200
Project NameRIVER QUARRY BLDG C
Customer Number 
ePlanReviewNo
Description
(PROCTOR & GAMBLE - RIVER QUARRY - BLDG C - 2ND FLR) Fire sprinklers substitute for 1-hr fire-resistant rated construction of the structure. To combine 3 tenant spaces into one 4,965 square foot office tenant space. This tenant space is located on the 20,150 square foot 2nd floor of a 62,400 square foot 3 story building. Work is to include interior nonbearing walls, doors, and millwork all per approved drawings and plan review report on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/24/20039/25/20039/25/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/23/2003 at 2:47:15 PM. Contact: ###-####.perm. occ. ok pending fire sign off. 9/25/2003 10:36:59 AM
FIRE-Final Inspection9/25/20039/25/20039/25/2003APASS
DetailsRick Jackson
FIRE-Final Inspection9/25/20039/25/20039/25/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/25/2003 at 8:39:21 AM. Contact: ###-####.
Permanent Occupancy 9/25/20039/25/2003 DONE
Details
BLD-Final9/23/20039/24/20039/24/2003PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/23/2003 at 2:47:15 PM. Contact: ###-####. waiting for fire final.rolled over am. 9/24/2003 4:27:41 PM
FIRE-Final Inspection9/23/20039/24/20039/24/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/23/2003 at 2:46:31 PM. Contact: ###-####. fire/life safety on temp occupancy per Dave Miller pending fire alarm sync module installed 9/24/2003 5:07:25 PM
BLD-Framing/Rough-in9/2/20039/2/20039/2/2003PPART
DetailsJim Storey
17. (Sheet A2.0 – Door 27A - Door encroachment) Doors opening into the path of egress travel shall
not reduce the required width to less than one-half during the course of the swing. When fully open, the
door shall not project more than 7 inches into the required width. (2000 IBC 1003.2.3.1)/ maintane ceilling to 1 hr corridor/