BLD-Final | 5/12/2008 | 5/14/2008 | 5/14/2008 | A | PASS |
Mike Jordan
|
|
|
309-Cheynne ###-####. Please call prior to insp.,, verify occ. # signs,, room #1=62,, room#2=41,, lobby=32. Verified occ. load signs. Ok for perm occ.
|
BLD-Final | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PART |
Tony Young
|
|
|
309-Cheynne ###-####. Please call prior to insp. T Cof O ok,, need occupant load signs, and verify zoning,, all else ok... rescheduled for Wed am
|
BLD-Final | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | CANC |
Mike Jordan
|
|
|
309-cheynne Phone #: ###-####. Rescheduled for Monday in am.
|
FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | A | FAIL |
Troy James
|
|
|
need public works, zoning, and achd final approval 4/22/2005 12:26:28 PM
|
BLD-Aging Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 | | CANC |
Troy James
|
|
|
wip 3/30/2005 10:15:58 AM
|
BLD-Energy code compliance | 11/1/2004 | 11/1/2004 | 11/1/2004 | P | PASS |
Troy James
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 10/21/2004 | 10/22/2004 | 10/22/2004 | P | CANC |
Troy James
|
|
|
dave collins; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 10/22/2004 | 10/22/2004 | 10/22/2004 | P | PASS |
Troy James
|
|
|
ok to insulate
|
BLD-Final | 10/20/2004 | 10/21/2004 | 10/21/2004 | A | FAIL |
Troy James
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
left c/n with contractor 10/21/2004 10:16:29 AM
|
BLD-Conference | 10/19/2004 | 10/19/2004 | 10/19/2004 | A | DONE |
Troy James
|
|
|
solving issues with the water lines over non insulated area.
|
BLD-Conference | 10/14/2004 | 10/15/2004 | 10/15/2004 | A | DONE |
Troy James
|
|
|
met with gary z. to discuss issues of pipe freezing, informed contractor to install ventilation at front patio area overhang 10/15/2004 9:49:39 AM
|
BLD-Conference | 10/13/2004 | 10/14/2004 | 10/14/2004 | P | CANC |
Troy James
|
|
|
troy can you make this gz 7949379 900 am
|
BLD-Conference | 10/13/2004 | 10/14/2004 | 10/14/2004 | P | CANC |
Gary Ziegler
|
|
|
troy can you make this gz 7949379 900 am
|
BLD-Conference | 10/13/2004 | 10/14/2004 | 10/14/2004 | A | CANC |
Troy James
|
|
|
|
BLD-Foundation | 10/4/2004 | 10/5/2004 | 10/5/2004 | A | CANC |
Troy James
|
|
|
dave==shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Other | 10/5/2004 | 10/5/2004 | 10/5/2004 | A | PASS |
Troy James
|
|
|
shear on walls and roof ok, engineer stamped letter stating H clips not needed at roof sheathing. 10/5/2004 9:50:11 AM
|
BLD-Framing/Rough-in | 9/21/2004 | 9/22/2004 | 9/22/2004 | P | FAIL |
Troy James
|
|
|
shear wall inspection please///dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walls ok need to install H clips at roof sheathing or ok from engineer. 9/22/2004 4:07:11 PM
|
BLD-Aging Inspection | 9/14/2004 | 9/14/2004 | 9/14/2004 | | PART |
Troy James
|
|
|
wip 9/14/2004 10:45:33 AM
|
BLD-Footing | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/15/2004 at 7:23:09 AM. Contact: ###-####.
|
BLD-Foundation | 7/12/2004 | 7/12/2004 | 7/12/2004 | P | PASS |
Troy James
|
|
|
mark guho; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Concrete | 7/8/2004 | 7/9/2004 | 7/9/2004 | P | FAIL |
Troy James
|
|
|
mark ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Need to install form work and rebar for interior footing. 7/9/2004 3:02:45 PM
|
BLD-Footing | 7/1/2004 | 7/2/2004 | 7/2/2004 | P | PASS |
Troy James
|
|
|
|
BLD-Foundation | 7/1/2004 | 7/1/2004 | 7/1/2004 | P | CANC |
Troy James
|
|
|
mark; please late as possible - Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|