Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-01695
StatusFinaled
Name GERALD TEAL
Site Address 6126 W STATE ST
Project NamePierce Park Sub
Customer Number 
ePlanReviewNo
Description
Sel Equity Real Estate Office Building * To construct a new 7,830 square foot, two story, wood framed office building on the east side of an existing two story office building. The new building first floor 4760 square feet, second floor 3070 square feet, total 7830 square feet. This new building will be fully fire sprinklered. The new building will be separated from the existing building by a two-hour fire resistive fire wall. All construction per the approved plans and attached comment list. Per the structural engineer, this site class "D" and seismic design category "C". DRH03-00022/PC#403-03/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/4/20046/4/20046/4/2004PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 6/4/2004 at 7:36:42 AM. Contact: ###-####.
ok for perm c of o 6/4/2004 4:27:42 PM
Permanent Occupancy 6/4/20046/4/2004 DONE
Details
BLD-Final4/26/20044/26/20044/26/2004APART
DetailsTony Young
Scheduled by a contractor via Hello! on 4/26/2004 at 7:26:39 AM. Contact: ###-####.
temp. occ. ok,,, need to finish a d a items,,, trades 4/26/2004 2:01:44 PM
BLD-Final4/22/20044/23/20044/23/2004PNR
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Annette Moore
conf. only on handrails, A.D.A. issues 4/23/2004 3:13:45 PM
BLD-Final4/14/20044/15/20044/15/2004ANR
DetailsTony Young
John; phone# ###-####
BLD-Conference4/13/20044/14/20044/14/2004ACANC
DetailsTony Young
conference on on final w/ John ###-####
BLD-Final4/14/20044/14/20044/14/2004PCANC
DetailsTony Young
john;phone#8674584
BLD-Conference4/13/20044/13/20044/13/2004PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 4/13/2004 at 7:17:04 AM. Contact: ###-####.
FIRE-Final Inspection4/13/20044/13/20044/13/2004APASS
DetailsTroy Cobbley
fire life safety finaled 4/13/2004 8:23:40 AM
FIRE-Final Inspection4/12/20044/12/20044/12/2004AFAIL
DetailsTroy Cobbley
Provide approved door hardware on the second floor double doors at conference room
FIRE-Final Inspection4/8/20044/8/20044/8/2004PFAIL
DetailsTroy Cobbley
Need to address issues for the fire alarm and the fire sprinkler inspections which include alarm signals being incorrect and no updated fire sprinkler drawings on site for their inspection. Other issues include exit signs and emergency lights not working, white lettering on the fire dept. access lanes, signage on riser room, hydraulic placards for riser, NFPA 25, forward flush of the backflow preventer. 4/8/2004 4:24:43 PM
BLD-Wall cover2/11/20042/12/20042/12/2004APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 2/11/2004 at 11:43:17 AM. Contact: ###-####.
ok to cover all 2/13/2004 5:24:35 PM
BLD-Wall cover2/3/20042/3/20042/3/2004APART
DetailsTony Young
Scheduled by a contractor via Hello! on 2/3/2004 at 6:40:52 AM. Contact: ###-####.
ok to cover rake areas on front and rear,, also the soffit areas 2/3/2004 10:23:14 AM
FIRE-Conference2/3/20042/3/20042/3/2004APART
DetailsTroy Cobbley
sprinkler piping on the north and south sides of the 2nd floor beams is ok to cover 2/3/2004 10:20:53 AM
BLD-Conference1/29/20041/30/20041/30/2004APART
DetailsTony Young
ph ###-####, Tony, re-inspect upper area between beams, b-4 10am
ok to cover ceiling between beams on upper floor 1/30/2004 10:32:45 AM
BLD-Wall cover1/28/20041/29/20041/29/2004AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 1/28/2004 at 8:45:18 PM. Contact: ###-####.
need to brace trusses, secure blocking, block under roof joists/plate 1/29/2004 2:55:55 PM
FIRE-Conference1/28/20041/29/20041/29/2004ADONE
DetailsTroy Cobbley
Inspection was for sprinkler rough-in 1/29/2004 10:46:55 AM
BLD-Framing/Rough-in1/12/20041/12/20041/12/2004PPART
DetailsTony Young
john center building shear; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ext shear on connecter building ok 1/12/2004 3:16:50 PM
BLD-Framing/Rough-in12/22/200312/22/200312/22/2003PPART
DetailsTony Young
Tony -- sheer; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
exterior shear ok 12/22/2003 4:35:19 PM
BLD-Framing/Rough-in12/18/200312/18/200312/18/2003PFAIL
DetailsTony Young
John --- sheer; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need to nail #2 walls better, finish straps and bolting 12/18/2003 4:24:31 PM
BLD-Conference12/17/200312/17/200312/17/2003PCANC
DetailsTony Young
john ###-####
BLD-Conference11/20/200311/21/200311/21/2003APART
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
bolts in colums ok, do draft stops per plan, truss bearing will be ok near steel colums due to added ftg 11/21/2003 11:39:49 AM
BLD-Foundation10/23/200310/23/200310/23/2003PPART
DetailsTony Young
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Footing10/21/200310/22/200310/22/2003APART
DetailsTony Young
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Footing10/20/200310/21/200310/21/2003PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 10/20/2003 at 3:30:15 PM. Contact: ###-####. cancel per John