BLD-Final | 3/15/2004 | 3/15/2004 | 3/15/2004 | P | PASS |
Jim Sly
|
|
|
karl evans; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 3/15/2004 2:07:15 PM OK for Perm Occ. :) 3/15/2004 2:07:41 PM
|
FIRE-Final Inspection | 3/15/2004 | 3/15/2004 | 3/15/2004 | P | CANC |
Troy Cobbley
|
|
|
fire life safety final already given 3/15/2004 2:49:57 PM
|
BLD-Final | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | FAIL |
Jim Sly
|
|
|
carl; Phone #: ###-#### Internet Inspection Request from: Annette Moore Need Temp glass at window by ADA shower....Per Bob A. 2/25/2004 8:51:01 AM
|
FIRE-Final Inspection | 2/24/2004 | 2/25/2004 | 2/25/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 2/25/2004 9:10:02 AM
|
BLD-Final | 2/18/2004 | 2/19/2004 | 2/19/2004 | A | PART |
Jim Sly
|
|
|
Karl --- FIR final is in the a.m. as well.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes \ OK for Temp. C/N (3) rated doors need smoke seals and rating tags cleaned. Waiting for interpretation for glazing at ADA shower. Remove key lock at S. E. door and install panic. Obtain Perm Occ status within 90 days of this notice. 2/19/2004 12:21:10 PM
|
FIRE-Final Inspection | 2/18/2004 | 2/19/2004 | 2/19/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the the southeast exit door gets approved door hardware installed 2/19/2004 11:20:26 AM
|
BLD-Final | 2/17/2004 | 2/18/2004 | 2/18/2004 | P | CANC |
Jim Sly
|
|
|
###-#### Karl
|
FIRE-Final Inspection | 2/17/2004 | 2/18/2004 | 2/18/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide approved door hardware on the southeast exterior door. Final fire alarm system 2/18/2004 4:00:49 PM
|
BLD-Final | 2/4/2004 | 2/5/2004 | 2/5/2004 | A | PART |
Jim Sly
|
|
|
Carl; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Grid OK. 2/5/2004 9:35:47 AM
|
BLD-Framing/Rough-in | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Jim Sly
|
|
|
CARL ( FIRE WALL ); Phone #: ###-#### Internet Inspection Request from: Darla Downs Framing OK. Contractor to call me to talk about Energy code Req.
12/17/2003 4:01:43 PM 12/17/2003 4:02:41 PM
|
BLD-Framing/Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | PART |
Jim Sly
|
|
|
carl; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OKd to 1 side.......Need to complete gyp membrane around electrical panels at 1hr walls (storage) and brace X ray machine tracks. 12/9/2003 10:24:26 AM
|