Permit Information
Permit NumberBLD03-01830
StatusFinaled
Name IDAHO CENTRAL CREDIT UNION
Site Address 200 N 4TH ST
Project NameTERRACE PLAZA
Customer Number 
ePlanReviewNo
Description
(IDAHO CENTRAL CREDIT UNION)(TERRACE PLAZA) To remodel restrooms on all floors for accessibility upgrade, provide new interior finish upgrades, add new smoke door across the existing corridor to separate the new breakroom area from the exit corridor, add support structure with decorative finishes to the building exterior and upgrade electrical, mechanical, plumbing and basement sprinkler sytem to meet tenant needs and provide compliance with current codes, all per approved plans to include notes theron & all attached plan review comments. NOTE: This building is fire sprinklered in the basement only. This project has been submitted and reviewed for a change in construction type, as a Type IIIB rather than Type IIIA construction type, since the building is not compliant with 1-hour construction. A "Letter of Compliance" is required for this project. DRH03-00109 PC03-436/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/200511/29/200512/1/2005PPASS
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Aging Inspection11/21/200511/21/200511/21/2005 NR
DetailsTom Arcoraci
FIRE-Final Inspection9/19/20059/19/20059/20/2005PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Final9/19/20059/19/20059/19/2005PFAIL
DetailsDave Hannah
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs handrail on ramp in basement
FIRE-Final Inspection9/14/20059/14/20059/14/2005PPART
DetailsForrest France
A smoke door to separate the new breakroom from the exiting corridor was not installed as indicated on the scope of work, contractor says plans do not indicate this door, waiting on clarification from architect in regards to this issue.
FIRE-Final Inspection7/14/20057/15/20057/15/2005AFAIL
DetailsForrest France
Clarify scope of work in regard to the installation of a new smoke door at exiting corridor from break room, fire sprinkler permit FIR04-00358 must be finaled prior to sign-off on building permit.
BLD-Framing/Rough-in5/4/20055/4/20055/4/2005PPART
DetailsDave Hannah
ceiling inspection please///paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover main entry area holes around elev and stair tower patched
BLD-Aging Inspection5/2/20055/2/20055/3/2005 PASS
DetailsDave Hannah
work in progress
BLD-Framing/Rough-in5/2/20055/2/20055/2/2005PPART
DetailsDave Hannah
paul///ceiling inspection on 1st floor lobby only please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceiling grid is org so its ok but need to patch holes in stair tower and elev shaft above ceiling line
BLD-Framing/Rough-in2/24/20052/25/20052/25/2005PPART
DetailsDave Hannah
Paul; Phone #: ###-#### Internet Inspection Request from: Jan Rice ceiling grid ok to drop in pannels 2/25/2005 3:23:19 PM
BLD-Framing/Rough-in2/15/20052/16/20052/16/2005APART
DetailsTroy James
Paul-basement; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to cover walls only upon approval of all trades. 2/16/2005 9:32:25 AM
BLD-Framing/Rough-in2/2/20052/2/20052/2/2005PPART
DetailsDave Hannah
this is in the basement bathroom please///paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore restrooms in basement ok to cover 2/2/2005 1:55:00 PM
BLD-Conference1/20/20051/21/20051/21/2005ACANC
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Conference1/21/20051/21/20051/21/2005PPART
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ada restrooms in basement 1/21/2005 2:12:41 PM
BLD-Framing/Rough-in1/14/20051/14/20051/14/2005PPART
DetailsDave Hannah
ceiling inspection please///paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to drop in pannels 1/14/2005 4:19:23 PM
BLD-Framing/Rough-in12/9/200412/10/200412/10/2004APART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice 1st floor bath room 12/10/2004 11:19:35 AM
BLD-Conference12/1/200412/1/200412/1/2004PDONE
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in11/18/200411/18/200411/18/2004PPART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ceiliong grid second floor bath rooms ok to drop in pannels 11/18/2004 3:19:21 PM
BLD-Framing/Rough-in11/5/200411/8/200411/8/2004PPART
DetailsDave Hannah
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore restroom on second floor ok to cover 11/8/2004 2:41:47 PM
BLD-Foundation10/14/200410/14/200410/14/2004PCANC
DetailsDave Hannah
ceiling grid-- mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/14/200410/14/200410/14/2004PPART
DetailsDave Hannah
ceiling grid-- mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 3rd floor ok to drop in ceiling panels after elec sign off
BLD-Framing/Rough-in9/30/200410/1/200410/1/2004PPART
DetailsDave Hannah
MIKE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 3rd floor bath rooms ok to cover after plumbing r/i 10/1/2004 2:05:41 PM
BLD-Aging Inspection8/17/20048/17/20048/17/2004 PASS
DetailsDave Hannah
wip 8/17/2004 9:28:54 AM
BLD-Conference6/5/20046/7/20046/7/2004ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/5/2004 at 12:59:06 PM. Contact: ###-####.
BLD-Footing5/13/20045/17/20045/17/2004APART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes north side column ftgs ok they will also have spec inspe 5/17/2004 11:12:38 AM
BLD-Aging Inspection5/12/20045/12/20045/12/2004 DONE
DetailsDave Hannah
exps on 8/4 5/12/2004 7:27:43 AM