BLD-Final | 10/7/2003 | 10/8/2003 | 10/8/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/7/2003 at 2:40:34 PM. ok for perm occ 10/8/2003 3:47:51 PM
|
FIRE-Final Inspection | 10/7/2003 | 10/8/2003 | 10/8/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/7/2003 at 2:39:25 PM. will have "Door to remain unlocked..." sign above door for structural inspector 10/8/2003 4:06:48 PM
|
Permanent Occupancy | | 10/8/2003 | 10/8/2003 | | DONE |
|
|
|
|
BLD-Final | 10/1/2003 | 10/2/2003 | 10/2/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 3:51:13 PM. Contact: ###-####.
|
BLD-Final | 10/1/2003 | 10/2/2003 | 10/2/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 3:51:13 PM. Contact: ###-####.
|
FIRE-Final Inspection | 10/1/2003 | 10/2/2003 | 10/2/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 3:48:53 PM. Contact: ###-####.
|
FIRE-Final Inspection | 10/1/2003 | 10/2/2003 | 10/2/2003 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 3:48:53 PM. Contact: ###-####. received a call from Jeff and they aren't ready and will reschedule 10/2/2003 1:49:35 PM
|
BLD-Framing/Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/18/2003 at 11:05:26 AM. Contact: ###-####. ok to cover suspended ceiling after elec r/i 9/19/2003 10:50:11 AM
|