BLD-Final | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2003 at 1:49:37 PM. Contact: ###-####. ok for perm occ. 10/31/2003 9:17:17 AM
|
FIRE-Final Inspection | 10/29/2003 | 10/30/2003 | 10/30/2003 | A | PASS |
Troy Cobbley
|
|
|
fire alarm, fire sprinkler and fire life safety finaled 10/30/2003 2:31:43 PM
|
BLD-Framing/Rough-in | 10/7/2003 | 10/7/2003 | 10/7/2003 | P | PASS |
Dave Hannah
|
|
|
BRANDON CEILING GRID; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to drop in pannals c/n items completed 10/7/2003 3:30:24 PM
|
BLD-Framing/Rough-in | 10/3/2003 | 10/6/2003 | 10/6/2003 | A | CANC |
Russ Owen
|
|
|
brandon celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downsout of time rolled over for pm. 10/5/2003 7:07:24 PM
|
BLD-Framing/Rough-in | 10/5/2003 | 10/6/2003 | 10/6/2003 | P | FAIL |
Russ Owen
|
|
|
ceiling grid 10/5/2003 7:05:02 PM left over from am. 10/5/2003 7:08:34 PM light cans in room 110 need support wires. called and talked to contractor will recall. 10/5/2003 10:13:36 PM
|
BLD-Framing/Rough-in | 9/16/2003 | 9/16/2003 | 9/16/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 8:08:34 AM. Contact: ###-####.c/n items completed 9/16/2003 3:36:28 PM
|
FIRE-Conference | 9/12/2003 | 9/15/2003 | 9/15/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 3:30:54 PM. Contact: ###-####. met with GC and a fire sprinkler permit is required due to overspacing of sprinklers; extinguishers; exit signs 9/15/2003 10:36:06 AM
|
BLD-Framing/Rough-in | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | PART |
Dave Hannah
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Darla Downsok to cover after elec also need to check elec hole on back side of elev shaft and remover screws that fasten ceil track to walls 9/12/2003 4:47:36 PM
|