Permanent Occupancy | | 7/20/2004 | 7/20/2004 | | DONE |
|
|
|
|
BLD-Final | 4/29/2004 | 4/30/2004 | 4/30/2004 | P | PART |
Russ Owen
|
|
|
ok, for a temp oc, needs all signatures and the c/n ite###-#### Craig. c/n posted.ms completed for a perm oc. 4/30/2004 12:18:12 AM
|
BLD-Final | 4/29/2004 | 4/30/2004 | 4/30/2004 | A | FAIL |
Russ Owen
|
|
|
###-#### Craig. c/n posted. 4/30/2004 12:14:34 AM
|
BLD-Final | 4/29/2004 | 4/30/2004 | 4/30/2004 | A | CANC |
Russ Owen
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 4/28/2004 | 4/29/2004 | 4/29/2004 | A | NR |
Troy Cobbley
|
|
|
Contractor is not ready. Inspection to be rescheduled for afternoon 4/29/2004 10:34:53 AM
|
FIRE-Final Inspection | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety for the shell/core finaled 4/29/2004 2:49:52 PM
|
Code Occupancy Approval Temp | | | 4/29/2004 | | DONE |
|
|
|
BOND IN PLACE SO I SIGNED OFF TEMP. OCCUPANCY.
|
FIRE-Final Inspection | 4/27/2004 | 4/28/2004 | 4/28/2004 | A | FAIL |
Troy Cobbley
|
|
|
Relocate emergency light at the south entry. Add an emergency light in the long corridor. Paint fire dept. access as discussed. Provide correct sticker at the main entry exits. Provide approved door hardware on doors 130-1 and 130-2 per plan review note #48. Provide additional permits for the tenants. 4/28/2004 1:54:20 PM
|
Code Occupancy Approval Temp | 4/27/2004 | 4/27/2004 | 4/27/2004 | P | PART |
Scott M.Brown
|
|
|
TO BOND FOR $15246 INCOMPLETE LANDSCAPE, I WAS TOLD THE REST WOULD BE IN PLACE? WHEN BOND POSTED WITH CATHY I CAN SIGN TEMP OCCUPANCY4/27/2004 3:48:00 PM 4/27/2004 3:48:45 PM
|
FIRE-Final Inspection | 4/27/2004 | 4/27/2004 | 4/27/2004 | P | FAIL |
Troy Cobbley
|
|
|
Relocate the emergency light as discussed away one fixture at the south exit. Add one emergency light in the middle of the long corridor. Paint curbing for fire dept. access per drawing sheet A.1 as discussed. Provide building address. Provide correct sticker at the main entry/exit. Resubmitt plans to the city for clarification on number of tenants for the building.
|
BLD-Other | 4/14/2004 | 4/15/2004 | 4/15/2004 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/14/2004 at 11:30:35 AM. Contact: ###-####. need perimeter wires in hall rest ok. 4/14/2004 11:23:18 PM
|
BLD-Energy code compliance | 3/10/2004 | 3/11/2004 | 3/11/2004 | A | PASS |
Russ Owen
|
|
|
|
BLD-Energy code compliance | 3/10/2004 | 3/10/2004 | 3/10/2004 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/10/2004 at 8:45:10 AM. Contact: ###-####. out off time. 3/10/2004 6:13:23 PM
|
BLD-Framing/Rough-in | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/5/2004 at 9:04:16 AM. Contact: ###-####. needs king studs added, ok to insulate other items ok. 3/5/2004 12:12:23 AM
|
BLD-Framing/Rough-in | 3/2/2004 | 3/2/2004 | 3/2/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/2/2004 at 9:48:25 AM. Contact: ###-####. c/n posted ok to insulate. 3/2/2004 12:02:29 AM
|
BLD-Framing/Rough-in | 2/20/2004 | 2/23/2004 | 2/23/2004 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/20/2004 at 11:46:20 AM. Contact: ###-####.ok to side. 2/22/2004 11:21:54 PM
|
BLD-Framing/Rough-in | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/17/2004 at 4:06:04 PM. Contact: ###-####.a few areas need nailing and some clairification on anchor bolts contractor on site with c/n. 2/18/2004 12:33:58 AM
|
BLD-Framing/Rough-in | 2/12/2004 | 2/13/2004 | 2/13/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/12/2004 at 10:10:55 AM. Contact: ###-####. roof ok for cover 2/13/2004 11:06:36 AM
|
BLD-Framing/Rough-in | 2/6/2004 | 2/9/2004 | 2/9/2004 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/6/2004 at 4:57:51 PM. Contact: ###-####. Roof needs additional nailing ,2 hold downs need installation, 1 is hd 8 needs to be hd 10. Went over areas with contractor will need to recall. 2/9/2004 5:49:57 PM
|
BLD-Framing/Rough-in | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | FAIL |
Troy James
|
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Shear wall inspection not complete too many areas not nailed off. Informed contractor not to install anymore felt on roof without naiing inspection complete. 2/2/2004 4:08:20 PM
|
BLD-Foundation | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | NR |
Russ Owen
|
|
|
Alan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Foundation | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PART |
Russ Owen
|
|
|
Ok special inspecion performed. 12/10/2003 3:25:03 PM
|
BLD-Footing | 12/5/2003 | 12/8/2003 | 12/8/2003 | A | PART |
Russ Owen
|
|
|
Alan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK BY SPECIAL INSP. 12/8/2003 2:32:48 PM
|