Permit Information
Permit NumberBLD03-01851
StatusFinaled
Name PETER H ROCKWELL
Site Address 8921 W HACKAMORE DR
Project NameAUDROC MORTGAGE BLDG
Customer Number 
ePlanReviewNo
Description
(Audroc Mortgage Building) * To construct a 5,479 one story , type VB office building. Other work includes all site improvements, paving and landscaping per approved plans and attachments, DRH03-00065. A "Letter of Compliance" is required as a condition of final approval for this permit, 'Shell & Core'.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 7/20/20047/20/2004 DONE
Details
BLD-Final4/29/20044/30/20044/30/2004PPART
DetailsRuss Owen
ok, for a temp oc, needs all signatures and the c/n ite###-#### Craig. c/n posted.ms completed for a perm oc. 4/30/2004 12:18:12 AM
BLD-Final4/29/20044/30/20044/30/2004AFAIL
DetailsRuss Owen
###-#### Craig. c/n posted. 4/30/2004 12:14:34 AM
BLD-Final4/29/20044/30/20044/30/2004ACANC
DetailsRuss Owen
craig; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection4/28/20044/29/20044/29/2004ANR
DetailsTroy Cobbley
Contractor is not ready. Inspection to be rescheduled for afternoon 4/29/2004 10:34:53 AM
FIRE-Final Inspection4/29/20044/29/20044/29/2004PPASS
DetailsTroy Cobbley
Fire life safety for the shell/core finaled 4/29/2004 2:49:52 PM
Code Occupancy Approval Temp  4/29/2004 DONE
BOND IN PLACE SO I SIGNED OFF TEMP. OCCUPANCY.
FIRE-Final Inspection4/27/20044/28/20044/28/2004AFAIL
DetailsTroy Cobbley
Relocate emergency light at the south entry. Add an emergency light in the long corridor. Paint fire dept. access as discussed. Provide correct sticker at the main entry exits. Provide approved door hardware on doors 130-1 and 130-2 per plan review note #48. Provide additional permits for the tenants. 4/28/2004 1:54:20 PM
Code Occupancy Approval Temp4/27/20044/27/20044/27/2004PPART
DetailsScott M.Brown
TO BOND FOR $15246 INCOMPLETE LANDSCAPE, I WAS TOLD THE REST WOULD BE IN PLACE? WHEN BOND POSTED WITH CATHY I CAN SIGN TEMP OCCUPANCY4/27/2004 3:48:00 PM 4/27/2004 3:48:45 PM
FIRE-Final Inspection4/27/20044/27/20044/27/2004PFAIL
DetailsTroy Cobbley
Relocate the emergency light as discussed away one fixture at the south exit. Add one emergency light in the middle of the long corridor. Paint curbing for fire dept. access per drawing sheet A.1 as discussed. Provide building address. Provide correct sticker at the main entry/exit. Resubmitt plans to the city for clarification on number of tenants for the building.
BLD-Other4/14/20044/15/20044/15/2004APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/14/2004 at 11:30:35 AM. Contact: ###-####. need perimeter wires in hall rest ok. 4/14/2004 11:23:18 PM
BLD-Energy code compliance3/10/20043/11/20043/11/2004APASS
DetailsRuss Owen
BLD-Energy code compliance3/10/20043/10/20043/10/2004PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/10/2004 at 8:45:10 AM. Contact: ###-####. out off time. 3/10/2004 6:13:23 PM
BLD-Framing/Rough-in3/5/20043/5/20043/5/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/5/2004 at 9:04:16 AM. Contact: ###-####. needs king studs added, ok to insulate other items ok. 3/5/2004 12:12:23 AM
BLD-Framing/Rough-in3/2/20043/2/20043/2/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/2/2004 at 9:48:25 AM. Contact: ###-####. c/n posted ok to insulate. 3/2/2004 12:02:29 AM
BLD-Framing/Rough-in2/20/20042/23/20042/23/2004APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 2/20/2004 at 11:46:20 AM. Contact: ###-####.ok to side. 2/22/2004 11:21:54 PM
BLD-Framing/Rough-in2/17/20042/18/20042/18/2004AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 2/17/2004 at 4:06:04 PM. Contact: ###-####.a few areas need nailing and some clairification on anchor bolts contractor on site with c/n. 2/18/2004 12:33:58 AM
BLD-Framing/Rough-in2/12/20042/13/20042/13/2004APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/12/2004 at 10:10:55 AM. Contact: ###-####. roof ok for cover 2/13/2004 11:06:36 AM
BLD-Framing/Rough-in2/6/20042/9/20042/9/2004PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 2/6/2004 at 4:57:51 PM. Contact: ###-####. Roof needs additional nailing ,2 hold downs need installation, 1 is hd 8 needs to be hd 10. Went over areas with contractor will need to recall. 2/9/2004 5:49:57 PM
BLD-Framing/Rough-in2/2/20042/2/20042/2/2004PFAIL
DetailsTroy James
Craig; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Shear wall inspection not complete too many areas not nailed off. Informed contractor not to install anymore felt on roof without naiing inspection complete. 2/2/2004 4:08:20 PM
BLD-Foundation12/9/200312/10/200312/10/2003ANR
DetailsRuss Owen
Alan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Foundation12/10/200312/10/200312/10/2003PPART
DetailsRuss Owen
Ok special inspecion performed. 12/10/2003 3:25:03 PM
BLD-Footing12/5/200312/8/200312/8/2003APART
DetailsRuss Owen
Alan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK BY SPECIAL INSP. 12/8/2003 2:32:48 PM