BLD-Final | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/18/2004 at 4:22:37 PM. Contact: ###-####. Ok for a perm oc, fire has signed off. 3/18/2004 5:45:27 PM 3/18/2004 5:45:38 PM
|
Permanent Occupancy | | 3/19/2004 | 3/19/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/6/2004 | 2/6/2004 | 2/6/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
BLD-Final | 11/10/2003 | 11/14/2003 | 11/14/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 5:00:47 PM. Contact: ###-####. Ok for temp pending fire for perm. 11/13/2003 6:37:16 PM
|
FIRE-Final Inspection | 11/10/2003 | 11/12/2003 | 11/12/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 4:59:59 PM. Contact: ###-####. Dave Miller approved temp occupancy for fire/life safety pending fire alarm submittals for required duct detectors on RTU 1 and 2; 11/12/2003 9:38:36 AM
|
BLD-Other | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/3/2003 at 7:23:38 AM. Contact: ###-####. Ok went with stand system ceiling.11/2/2003 10:11:04 PM 11/2/2003 10:11:13 PM
|
BLD-Other | 10/27/2003 | 10/28/2003 | 10/28/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/27/2003 at 7:57:12 AM. Contact: ###-####. 10/28/2003 10:15:39 AM C/N provide eng for ceiling grid.....standard or floating system? (no seismic pods) 10/28/2003 10:19:17 AM
|
BLD-Framing/Rough-in | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PASS |
Russ Owen
|
|
|
/2003 1:08:07 AM 9/30/2003 1:08:21 AM 9/30/2003 1:09:50 AM ok to drywall 9/30/2003 4:56:29 PM
|
BLD-Framing/Rough-in | 9/29/2003 | 9/30/2003 | 9/30/2003 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 9:23:31 AM. Contact: ###-####. out of time 9/30/2003 5:20:45 PM
|