Permit Information
Permit NumberBLD03-01977
StatusFinaled
Name MAI THAI RESTAURANT
Site Address 750 W IDAHO ST
Project NameUNION BLOCK-1ST FLR
Customer Number 
ePlanReviewNo
Description
(MAI THAI RESTAURANT INC)(UNION BLOCK-1ST FLR) New restaurant tenant in an existing 2,645 sq. ft. space with a 2,600 sq. ft. storage basement in an existing building per approved plans. Space was previously used as a restaurant and the existing kitchen equipment will remain with no changes. Work to include some minor interior demolition work, a new bar, a few new interior walls or wall infill, a small new stairway with handrails at elevated private dining room, interior finish, a new walk-in cooler in basement, minor fire sprinkler work, plumbing work, and electrical work including new lighting and switching on the main floor. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. (PC#0487-03) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/9/20043/11/20043/11/2004ACANC
DetailsTroy James
Danton, ###-#### - Cathy has the sign off card - please call 1st so he can unlock restaurant for you.
Still need fire approval. 3/10/2004 10:00:51 AM
BLD-Final3/10/20043/11/20043/11/2004APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 3/10/2004 at 3:51:25 PM. Contact: ###-####.
Permanent Occupancy 3/11/20043/11/2004 DONE
Details
FIRE-Final Inspection3/9/20043/10/20043/10/2004PPASS
DetailsRick Jackson
Danton, ###-#### - Cathy has the sign off card - please call 1st so he can meet you there Fire/life safety okay 3/10/2004 3:41:44 PM
FIRE-Conference2/10/20042/10/20042/10/2004APART
DetailsRick Jackson
sprinklers heads not installed in all rooms in basement; heads obstructed in basement; need cages on all heads; curtain installed at main exit obstructing it and plastic lobby installed at main exit; repair exit sign; called GC ###-#### about these problems 2/10/2004 9:45:16 AM
BLD-Final11/12/200311/12/200311/12/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/12/2003 at 11:20:05 AM. Contact: ###-####. ok for temp occ 11/12/2003 3:24:56 PM
FIRE-Final Inspection11/12/200311/12/200311/12/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/12/2003 at 11:18:27 AM. Contact: ###-####. temp occupancy approved per Dave Miller for fire/life safety pending connection of hood extinguishing system ot fire alarm system 11/12/2003 2:53:02 PM
BLD-Final11/7/200311/10/200311/10/2003PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/7/2003 at 3:36:14 PM. Contact: ###-####. fire failed no insp. performed until fire passes. 11/10/2003 1:05:44 PM
FIRE-Conference11/7/200311/10/200311/10/2003AFAIL
DetailsTroy Cobbley
provide the emergency light in the exit corridor and occupant load sign. Project still needs the fire alarm system approved. No temp occupancy was given due to the items above and no fire alarm plans have been submitted at this time 11/10/2003 10:20:38 AM
FIRE-Final Inspection11/5/200311/6/200311/6/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/5/2003 at 5:21:58 PM. Contact: ###-####. need emergency light at main exit, kitchen, and north end of corridor; occupant load sign; remove tape from head in kitchen and server area; extinguishing system needs semi-annual inspection; extinguishers need inspection; Dave Miller to approve temp occupancy pending extinguishing system tied into alarm system as plans are in the process 11/6/2003 2:54:10 PM