BLD-Final | 3/9/2004 | 3/11/2004 | 3/11/2004 | A | CANC |
Troy James
|
|
|
Danton, ###-#### - Cathy has the sign off card - please call 1st so he can unlock restaurant for you.
Still need fire approval. 3/10/2004 10:00:51 AM
|
BLD-Final | 3/10/2004 | 3/11/2004 | 3/11/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/10/2004 at 3:51:25 PM. Contact: ###-####.
|
Permanent Occupancy | | 3/11/2004 | 3/11/2004 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/9/2004 | 3/10/2004 | 3/10/2004 | P | PASS |
Rick Jackson
|
|
|
Danton, ###-#### - Cathy has the sign off card - please call 1st so he can meet you there Fire/life safety okay 3/10/2004 3:41:44 PM
|
FIRE-Conference | 2/10/2004 | 2/10/2004 | 2/10/2004 | A | PART |
Rick Jackson
|
|
|
sprinklers heads not installed in all rooms in basement; heads obstructed in basement; need cages on all heads; curtain installed at main exit obstructing it and plastic lobby installed at main exit; repair exit sign; called GC ###-#### about these problems 2/10/2004 9:45:16 AM
|
BLD-Final | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2003 at 11:20:05 AM. Contact: ###-####. ok for temp occ 11/12/2003 3:24:56 PM
|
FIRE-Final Inspection | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/12/2003 at 11:18:27 AM. Contact: ###-####. temp occupancy approved per Dave Miller for fire/life safety pending connection of hood extinguishing system ot fire alarm system 11/12/2003 2:53:02 PM
|
BLD-Final | 11/7/2003 | 11/10/2003 | 11/10/2003 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/7/2003 at 3:36:14 PM. Contact: ###-####. fire failed no insp. performed until fire passes. 11/10/2003 1:05:44 PM
|
FIRE-Conference | 11/7/2003 | 11/10/2003 | 11/10/2003 | A | FAIL |
Troy Cobbley
|
|
|
provide the emergency light in the exit corridor and occupant load sign. Project still needs the fire alarm system approved. No temp occupancy was given due to the items above and no fire alarm plans have been submitted at this time 11/10/2003 10:20:38 AM
|
FIRE-Final Inspection | 11/5/2003 | 11/6/2003 | 11/6/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/5/2003 at 5:21:58 PM. Contact: ###-####. need emergency light at main exit, kitchen, and north end of corridor; occupant load sign; remove tape from head in kitchen and server area; extinguishing system needs semi-annual inspection; extinguishers need inspection; Dave Miller to approve temp occupancy pending extinguishing system tied into alarm system as plans are in the process 11/6/2003 2:54:10 PM
|