BLD-Aging Inspection | 11/2/2004 | 11/2/2004 | 11/2/2004 | | PASS |
Jim Storey
|
|
|
final ok 11/2/2004 8:23:47 AM
|
BLD-Final | 8/30/2004 | 8/31/2004 | 8/31/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/30/2004 at 10:08:18 AM. Contact: ###-####. final letter from engineer to justify si to be recieved at racking permit c/n insp. 8/31/2004 3:07:08 PM
|
BLD-Final | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/30/2004 at 10:08:18 AM. Contact: ###-####.
|
FIRE-Final Inspection | 8/30/2004 | 8/30/2004 | 8/30/2004 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/30/2004 at 10:07:48 AM. Contact: ###-####.
|
BLD-Final | 8/27/2004 | 8/27/2004 | 8/27/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/27/2004 at 8:31:35 AM. Contact: ###-####. need si final doc. 8/27/2004 3:33:29 PM
|
FIRE-Final Inspection | 8/27/2004 | 8/27/2004 | 8/27/2004 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/27/2004 at 8:30:47 AM. Contact: ###-####. See fire alarm permit 8/27/2004 4:16:25 PM
|
Code Occupancy Approval | 8/25/2004 | 8/25/2004 | 8/25/2004 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 8/25/2004 4:20:19 PM
|
BLD-Aging Inspection | 7/29/2004 | 7/29/2004 | 7/29/2004 | | NR |
Jim Storey
|
|
|
wip 7/29/2004 8:27:53 AM
|
BLD-Framing/Rough-in | 5/26/2004 | 5/27/2004 | 5/27/2004 | P | PASS |
Jim Storey
|
|
|
###-#### pat ok pending ele to complet 5/27/2004 3:30:22 PM
|
FIRE-Conference | 5/26/2004 | 5/27/2004 | 5/27/2004 | P | DONE |
Troy Cobbley
|
|
|
pat; Phone #: ###-#### I spoke with pat about the exhuast duct and fire/smoke damper from the elevator equipment room to the exterior wall. He wants to have it exhaust to the roof. I spoke with the plan reviewer who said if they want to change things the contractor will need to resubmit 5/27/2004 11:56:08 AM
|
BLD-Conference | 5/18/2004 | 5/19/2004 | 5/19/2004 | A | PART |
Jim Storey
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip ok to one side gyp/ 5/19/2004 2:55:50 PM
|
BLD-Concrete | 3/24/2004 | 3/26/2004 | 3/26/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 3:25:50 PM. Contact: ###-####. pending report bar appears ok. 3/26/2004 3:50:07 PM
|
BLD-Concrete | 3/1/2004 | 3/2/2004 | 3/2/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/1/2004 at 2:12:42 PM. Contact: ###-####. tilt slab walls pending report 3/2/2004 2:16:39 PM
|
BLD-Concrete | 2/25/2004 | 2/26/2004 | 2/26/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 12:23:20 PM. Contact: ###-####. tilt slab wall pour placed w/sp pending report. 2/26/2004 2:02:32 PM
|
BLD-Aging Inspection | 2/23/2004 | 2/23/2004 | 2/23/2004 | | NR |
Jim Storey
|
|
|
wip 2/23/2004 11:05:59 AM
|
BLD-Concrete | 2/23/2004 | 2/23/2004 | 2/23/2004 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/23/2004 at 11:10:55 AM. Contact: ###-####. wall panels reviewed with special insp. on site ok per plan pending report. 2/23/2004 2:41:37 PM
|
BLD-Footing | 12/19/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/19/2003 at 11:26:34 AM. Contact: ###-####.
|