BLD-Final | 12/10/2004 | 12/10/2004 | 12/10/2004 | P | PASS |
Jim Sly
|
|
|
Internet Inspection Request from: Jan Rice \ OK for Perm Occ. :) 12/10/2004 3:14:48 PM 12/10/2004 3:15:04 PM
|
Permanent Occupancy | | 12/10/2004 | 12/10/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/10/2004 | 11/15/2004 | 11/15/2004 | A | NR |
Jim Sly
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
FIRE-Final Inspection | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | FAIL |
Troy Cobbley
|
|
|
Smoke detector did not work 11/15/2004 8:24:21 AM
|
FIRE-Final Inspection | 11/15/2004 | 11/15/2004 | 11/15/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 11/15/2004 10:39:55 AM
|
Code Occupancy Approval | 11/15/2004 | 11/12/2004 | 11/12/2004 | A | PASS |
Carol Montgomery
|
|
|
Meets compliance withthe CU. Passed. 11/15/2004 8:42:01 AM
|
FIRE-Final Inspection | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide photo detector or push to silence feature at kitchen. Provide occupant load sign. Provide blank on exit door from laundry. Provide building address 11/12/2004 8:53:12 AM
|
FIRE-Conference | 11/9/2004 | 11/9/2004 | 11/9/2004 | P | DONE |
Troy Cobbley
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Conference | 10/19/2004 | 10/20/2004 | 10/20/2004 | A | PART |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need to meet with Dixie and HVAC Contr. 10/20/2004 3:17:20 PM
|
BLD-Conference | 9/16/2004 | 9/16/2004 | 9/16/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/16/2004 at 9:31:10 AM. Contact: ###-####.
|
BLD-Energy code compliance | 8/16/2004 | 8/17/2004 | 8/17/2004 | A | PASS |
Jim Sly
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Energy code compliance | 8/17/2004 | 8/17/2004 | 8/17/2004 | P | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Frame pass......all penitrations in floor/ceiling assembly to have ceiling dampers exept 1 at N. E. corner. all ceilings are insulated.....No attic access for vaulted area except at Cupulo. 8/17/2004 2:03:43 PM
|
BLD-Energy code compliance | 8/10/2004 | 8/11/2004 | 8/11/2004 | P | PASS |
Jim Sly
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Scott to call me back to look at some membrane penitration issues....ie tunnelizing HVAC. 8/11/2004 1:52:31 PM
|
BLD-Framing/Rough-in | 8/9/2004 | 8/10/2004 | 8/10/2004 | P | PASS |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 8/10/2004 3:19:50 PM
|
BLD-Energy code compliance | 8/5/2004 | 8/6/2004 | 8/6/2004 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/5/2004 at 4:56:49 PM. C/N posed. 8/6/2004 11:26:47 AM
|
BLD-Framing/Rough-in | 8/4/2004 | 8/5/2004 | 8/5/2004 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 12:14:19 PM. Contact: ###-####. 8/5/2004 1:08:04 PM
|
BLD-Framing/Rough-in | 7/26/2004 | 7/26/2004 | 7/26/2004 | P | PART |
Tom Arcoraci
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes OK TO COVER EXT DRYWALL 7/26/2004 1:51:02 PM
|
BLD-Framing/Rough-in | 7/16/2004 | 7/19/2004 | 7/19/2004 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 10:30:52 AM. Contact: ###-####. ext nailing ok 7/19/2004 9:32:31 AM
|
BLD-Framing/Rough-in | 7/13/2004 | 7/13/2004 | 7/13/2004 | P | PART |
Jim Sly
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Conf with Contractor. 7/13/2004 3:18:20 PM
|
BLD-Foundation | 6/3/2004 | 6/4/2004 | 6/4/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/3/2004 at 2:28:25 PM.
|
BLD-Concrete | 6/3/2004 | 6/3/2004 | 6/3/2004 | P | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Footing. 6/3/2004 2:36:24 PM
|