BLD-Final | 6/1/2004 | 6/1/2004 | 6/1/2004 | | DONE |
Jim Sly
|
|
|
Fireplace finaled - ok for LC
|
BLD-Final | 5/21/2004 | 5/24/2004 | 5/24/2004 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/21/2004 at 4:17:46 PM. Contact: ###-####. Need F/P finaled. 5/24/2004 3:48:39 PM
|
BLD-Framing/Rough-in | 2/25/2004 | 2/26/2004 | 2/26/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 4:55:40 PM. Contact: ###-####. front entry 2/26/2004 9:14:49 AM
|
BLD-Wall cover | 2/10/2004 | 2/11/2004 | 2/11/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/10/2004 at 11:19:42 AM. Okay to sheetrock interior walls. Framing not complete at exterior entry. 2/11/2004 9:53:16 AM
|
BLD-Framing/Rough-in | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | PART |
Troy James
|
|
|
ok to insulate. Framing not complete at entry exterior.
|
BLD-Framing/Rough-in | 2/5/2004 | 2/6/2004 | 2/6/2004 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/5/2004 at 11:20:57 AM. Contact: ###-####. Need to complete penetration seal at top plate where drop ceiling occur. Need additional 1 3/4 x 117/8 LVL second level floor. See note 3. Need to complete front entry framing. Fire blocking at pantry drop ceiling. 2/6/2004 4:38:24 PM
|
BLD-Footing | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/30/2003 at 2:05:40 PM. Contact: ###-####. work in progress 10/1/2003 9:53:16 AM
|