Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02236
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 3138 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(Bown Crossing Market Place-Bldg A) * To construct a new 8,870 sq.ft. noncombustible, two story, combination retail, office and residential, shell only building, on a zero lot line. The 1st floor is 5,080 sq,ft and the 2nd floor is 3,790 sq.ft. NOTE: This building is fully fire sprinklered per NFPA 13 and is being used for code reductions and fire flow. Separate permits, plans and Certificate of Occupancies must be obtained and approved for each tenant space to be occupied. All construction per the approved plans and attached comment list. MJP PC#551-03 DRH03-00034
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/17/200510/17/200510/17/2005 PASS
DetailsJim Storey
DOC - Permit Finaled10/17/200510/17/200510/17/2005PPASS
DetailsJim Storey
FIRE-Final Inspection8/12/20058/15/20058/15/2005APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection8/11/20058/12/20058/12/2005AFAIL
DetailsTroy Cobbley
Need to repair the emergency lights in the stairwells and the exit discharge lighting. Provide NFPA 72 record of completion forms to the inspector as well.
BLD-Final8/11/20058/12/20058/11/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/11/2005 at 10:53:01 AM. Contact: ###-####.ceilling ok
FIRE-Final Inspection8/11/20058/11/20058/11/2005PFAIL
DetailsTroy Cobbley
repair emergency lights and provide the canopies for the sprinkler pendants. final fire alrm permit
Code Occupancy Approval8/10/20058/10/20058/10/2005PPASS
DetailsWm. Michael Meloy
Compliance met.
BLD-Aging Inspection6/20/20056/20/20056/20/2005 PASS
DetailsJim Storey
wip
BLD-Framing/Rough-in4/19/20054/19/20054/19/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/19/2005 at 9:17:31 AM. Contact: ###-####.east stair framing ok.
BLD-Framing/Rough-in4/7/20054/8/20054/8/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/7/2005 at 12:40:16 PM.
BLD-Framing/Rough-in3/22/20053/23/20053/23/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/22/2005 at 5:00:24 PM. Contact: ###-####. p/l wall ok /insulation ok. 3/23/2005 2:59:12 PM
BLD-Other3/15/20053/15/20053/15/2005PPASS
DetailsJim Storey
first floor to 2nd ok 2hr wall joint fire stopping
BLD-Aging Inspection9/10/20049/10/20049/10/2004 PASS
DetailsJim Storey
wip 9/13/2004 11:39:18 AM
BLD-Aging Inspection6/22/20046/22/20046/22/2004 PASS
DetailsJim Storey
BLD-Framing/Rough-in4/16/20044/16/20044/16/2004PPASS
DetailsJim Storey
nick grouting; Phone #: ###-#### Internet Inspection Request from: Darla Downs special insp. onsite. 4/16/2004 3:49:36 PM
BLD-Aging Inspection3/15/20043/15/20043/15/2004 PASS
DetailsJim Storey
wip 3/15/2004 8:18:22 AM
BLD-Foundation1/9/20041/12/20041/12/2004APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/9/2004 at 2:35:08 PM. Contact: ###-####. Subject to special inspection. 1/12/2004 10:52:27 AM
BLD-Footing12/30/200312/31/200312/31/2003ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/30/2003 at 8:59:26 AM. Contact: ###-####.