BLD-Final | 11/25/2003 | 11/26/2003 | 11/26/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/25/2003 at 1:45:10 PM. Contact: ###-####. OK for Perm Occ. :) 11/26/2003 3:14:07 PM
|
FIRE-Final Inspection | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety and fire sprinkler finaled 11/26/2003 9:03:22 AM
|
FIRE-Final Inspection | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | FAIL |
Troy Cobbley
|
|
|
hang fire extinguisher, repair the exit sign, remove the door magnet and provide closure on the connecting door 11/25/2003 4:31:38 PM
|
FIRE-Final Inspection | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | FAIL |
Troy Cobbley
|
|
|
hang fire extinguisher, repair the exit sign, remove the door magnet and provide closure on the connecting door 11/25/2003 4:31:38 PM
|
BLD-Framing/Rough-in | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/31/2003 at 11:06:18 AM. Contact: ###-####.
|