BLD-Final | 6/10/2004 | 6/10/2004 | 6/10/2004 | P | PASS |
Troy James
|
|
|
colin; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 5/20/2004 | 5/21/2004 | 5/21/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 2:06:05 PM. Contact: ###-####. ok for temp occ needs plumb to go prem needs to install signage and one fire damper at 6th floor storage room 5/21/2004 10:17:49 AM
|
BLD-Final | 5/19/2004 | 5/20/2004 | 5/20/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2004 at 11:45:18 AM. Contact: ###-####. needs letters from mti and engineer, ADA signage elev stairs restrooms .needs fire wall and fire dampers 7thfl around fire storage room need fire damper and fire caulking storage room 5/20/2004 11:17:58 AM
|
FIRE-Final Inspection | 5/18/2004 | 5/19/2004 | 5/19/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/18/2004 at 4:11:59 PM. Contact: ###-####.
|
BLD-Other | 5/7/2004 | 5/7/2004 | 5/7/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/7/2004 at 7:46:43 AM. Contact: ###-####. ceiling gred 7th floor ok 5/7/2004 3:40:55 PM
|
BLD-Framing/Rough-in | 4/26/2004 | 4/27/2004 | 4/27/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 11:07:17 AM. Contact: ###-####. 4/27/2004 10:51:41 AM ceiling grid ok to cover 4/27/2004 4:02:58 PM
|
FIRE-Sprinkler Rough-in | 4/16/2004 | 4/19/2004 | 4/19/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/16/2004 at 1:08:55 PM. Contact: ###-####. See sprinkler FIR permit for details 4/19/2004 3:00:36 PM
|
FIRE-Sprinkler Rough-in | 4/9/2004 | 4/12/2004 | 4/12/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/9/2004 at 12:42:05 PM. Contact: ###-####. See sprinkler permit for details; okay to cover perimeter offices as shown on sprinkler plans 4/12/2004 10:30:46 AM
|
BLD-Framing/Rough-in | 4/5/2004 | 4/6/2004 | 4/6/2004 | A | CANC |
Dave Hannah
|
|
|
colyn celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 4/6/2004 | 4/6/2004 | 4/6/2004 | P | PART |
Dave Hannah
|
|
|
colyn celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs out side rooms ok to cover after elec signs off lights 4/6/2004 5:29:06 PM
|
BLD-Conference | 3/24/2004 | 3/25/2004 | 3/25/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 10:32:04 AM.
|
FIRE-Conference | 3/25/2004 | 3/25/2004 | 3/25/2004 | A | PART |
Rick Jackson
|
|
|
Met with GC about exit signs 3/25/2004 11:21:41 AM
|
BLD-Framing/Rough-in | 2/27/2004 | 2/27/2004 | 2/27/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/27/2004 at 10:37:38 AM. Contact: ###-####.
|
FIRE-Conference | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/23/2004 at 11:04:03 AM. Contact: ###-####. met with GC about fire extinguisher placement - will two additional at stair doors and the others as shown on plans 2/24/2004 8:52:35 AM
|
BLD-Framing/Rough-in | 2/20/2004 | 2/20/2004 | 2/20/2004 | P | PART |
Dave Hannah
|
|
|
colyn; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to start covering infill walls allbut se corner 2/20/2004 4:01:03 PM
|
BLD-Conference | 2/12/2004 | 2/13/2004 | 2/13/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/12/2004 at 1:29:52 PM.
|
FIRE-Final Inspection | 2/13/2004 | 2/13/2004 | 2/13/2004 | A | DONE |
Rick Jackson
|
|
|
not a final but a conference to determine GC procedure for working in stairwell - the stairwell will be maintained during construction 2/13/2004 4:05:46 PM
|