Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-02329
StatusFinaled
Name BOWN CROSSING MARKET PLACE BLDG G
Site Address 3139 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(Bown Crossing Market Place-Bldg G) * To construct a new 6,417 sq.ft. two story, multi-tenant, shell only building. The first floor is 4,110 s.f. and the second floor is 2,307 sq.ft. with two exterior second fllor decks at 300 sq.ft. each. NOTE: This building is fully fire sprinklered for Code reduction and fire flow. Separate permits, plans and Certificate of Occupancies must be obtained and approved for each tenant space to be occupied. Alll construction per the approved plans and attached comment list. The installation of two roof top heating units are being installed for freeze protection. MJP PC#589-03 DRH03-00034
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/22/20056/23/20056/24/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/22/2005 at 5:10:19 PM. Contact: ###-####.
DOC - Permit Finaled6/24/20056/24/20056/24/2005PPASS
DetailsJim Storey
FIRE-Final Inspection6/22/20056/23/20056/23/2005PPASS
DetailsForrest France
Core and shell fire safety passed inspection.
Code Occupancy Approval6/22/20056/22/20056/22/2005APASS
DetailsWm. Michael Meloy
Compliance met.
Code Occupancy Approval6/22/20056/22/20056/22/2005ACANC
DetailsWm. Michael Meloy
FIRE-Final Inspection6/20/20056/21/20056/21/2005PCANC
DetailsForrest France
Cancel inspection per Burl with AIC, not ready for inspection, waiting on phone lines and smoke detector install.
BLD-Aging Inspection6/14/20056/14/20056/14/2005 PASS
DetailsJim Storey
wip
BLD-Framing/Rough-in4/1/20054/4/20054/4/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/1/2005 at 1:52:06 PM. Contact: ###-####. STAIRS OK
BLD-Other3/15/20053/15/20053/15/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/15/2005 at 10:23:34 AM. Contact: ###-####.first floor fire stopping at 2hr wall joint ok to first floor ceilling.
BLD-Conference3/11/20053/11/20053/11/2005PPASS
DetailsJim Storey
KENT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in3/11/20053/11/20053/11/2005PPASS
DetailsJim Storey
KENT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Concrete2/17/20052/17/20052/17/2005PPASS
DetailsJim Storey
2nd floor deck ok for placment of concrete.
BLD-Conference2/9/20052/10/20052/10/2005APASS
DetailsJim Storey
kent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ec reports resubmitted ok and roof insulation spec approved for r-25/pending special insp. engineers responce to weld vs bolt up. 2/10/2005 9:16:33 AM
BLD-Aging Inspection10/1/200410/1/200410/1/2004 PASS
DetailsJim Storey
wip 10/4/2004 9:42:18 AM
BLD-Aging Inspection6/8/20046/8/20046/8/2004 PASS
DetailsJim Storey
BLD-Aging Inspection4/6/20044/6/20044/6/2004 PASS
DetailsJim Storey
wip 4/6/2004 11:28:24 AM
BLD-Foundation1/21/20041/22/20041/22/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/21/2004 at 4:27:39 PM. Contact: ###-####. wip. 1/22/2004 10:45:16 AM