Permit Information
Permit NumberBLD03-02330
StatusFinaled
Name BOWN CROSSING MARKET PLACE BLDG H
Site Address 3111 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(Bown Crossing Market Place-Bldg H) To construct a new 6,557 sq.ft. two story, multi-tenant shell building. The first floor is 3,457 sq.ft and the second floor is 3,100 sq.ft. NOTE: Fire sprinklers installed for story increase, an A-2 Occupancy on the second floor and code reduction. Separate permits, plans and Certificate of Occupancies must be obtained and approved for each tenant space to be occupied. Alll construction per the approved plans and attached comment list. The installation of two roof top heating units are being installed for freeze protection. (PLAN MODIFICATION APRIL 2, 2004) To install an elevator in this building, provide an accessible route to the second floor and provide an accessible entrance to the elevator from each separate tenant spaces within this building. Add a new door to the existing center stair enclosure and make all door in this stair enclosure meet opening protection ratings per IBC Table 714.2. MJP PC#590-03 DRH03-00034
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/26/20051/26/20051/26/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/26/2005 at 9:38:55 AM. Contact: ###-####.
Code Occupancy Approval  1/25/2005 PASS
Compliance met.
Code Occupancy Approval12/6/200412/7/200412/7/2004AFAIL
DetailsWm. Michael Meloy
Compliance not met, no landscaping and outside stairs and balconies. 12/9/2004 10:45:37 AM
Code Occupancy Approval12/6/200412/7/200412/7/2004ACANC
DetailsWm. Michael Meloy
BLD-Aging Inspection10/5/200410/5/200410/5/2004 PASS
DetailsJim Storey
wip 10/5/2004 8:29:05 AM
BLD-Aging Inspection6/8/20046/8/20046/8/2004 PASS
DetailsJim Storey
BLD-Foundation2/25/20042/25/20042/25/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 2/25/2004 at 7:40:30 AM. Contact: ###-####.
BLD-Conference2/18/20042/18/20042/18/2004PPASS
DetailsJim Storey
aproved revision of mec-check to cmu wall insulation on file on site for revised report.
BLD-Footing2/18/20042/18/20042/18/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/18/2004 at 9:17:47 AM. Contact: ###-####. rebar in progess/ pending special insp. report. 2/18/2004 3:50:31 PM