Permit Information
Permit NumberBLD03-02402
StatusFinaled
Name CALVARY CHAPEL ELEMENTARY SCHOOL
Site Address 111 S AUTO DR
Project NameCALVARY CHAPEL
Customer Number 
ePlanReviewNo
Description
(CALVARY CHAPEL - ELEMENTARY SCHOOL BUILDING) This building is fire sprinklered for story increase and to allow both 2nd floor stairways to be open. To convert an existing 2 story, 6,584 square foot building to an elementary school. The 1st floor has a floor area of 3,340 square feet (101 occupant load) and the 2nd floor has a floor area of 3,244 square feet (96 occupant load). Work is to include interior nonbearing walls, new exterior doors, two reconstructed stairways, and a wheelchair lift all per the approved drawings and the plan review report on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW** CUP03-00063 and DRH03-00134.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/28/20049/29/20049/29/2004APASS
DetailsLane Manuel
Cathy has the card, everyone else is approved/final
ok for permanent cert. of occupancy 9/29/2004 10:58:00 AM
Permanent Occupancy 9/29/20049/29/2004 DONE
Details
BLD-Final4/23/20044/23/20044/23/2004PPART
DetailsRuss Owen
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. Ok temp oc, need restrooms completed for a final and all other signatures on card. 4/22/2004 11:31:37 PM
Code Occupancy Approval Temp4/23/20044/23/20044/23/2004PDONE
DetailsScott M.Brown
SIGNED TEMP ONLY SO THEY CAN MOVE OFFICE ITEMS NEXT WEEK, WILL MKE FINAL INSPECTION NEXT WEEK 4/23/2004 2:40:05 PM
FIRE-Final Inspection4/23/20044/23/20044/23/2004APASS
DetailsTroy Cobbley
Fire life safety finaled. Curbing painting for fire dept. access will be painted when the curbing is building at next building
FIRE-Final Inspection4/20/20044/20/20044/20/2004PFAIL
DetailsTroy Cobbley
Provide ceiling tile around sprinkler pendants, Provide approved door hardware for all doors, provide building address, provide knox key box, test fire alarm system, install fire extinguishers, Provide emergency light in first floor corridor and final sprinkler system
BLD-Framing/Rough-in4/6/20044/7/20044/7/2004AFAIL
DetailsRuss Owen
above grid inspection please///tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore went over araes that need wires with contractor. 4/6/2004 6:56:24 PM
BLD-Other4/6/20044/7/20044/7/2004PPART
DetailsRuss Owen
new grid ok , some existing grid left in place just new tiles. 4/8/2004 12:12:50 AM
BLD-Framing/Rough-in3/31/20043/31/20043/31/2004PPART
DetailsRuss Owen
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore went over grid requirements. 3/31/2004 1:15:44 AM
BLD-Framing/Rough-in3/5/20043/5/20043/5/2004PPART
DetailsRuss Owen
###-#### tim
BLD-Framing/Rough-in3/1/20043/2/20043/2/2004APART
DetailsRuss Owen
###-#### Ken Ok to start drywall, a plan mod is in the office waiting to be picked up. 3/1/2004 7:51:57 PM
BLD-Framing/Rough-in3/1/20043/1/20043/1/2004PFAIL
DetailsRuss Owen
###-#### timothy, pending a plan modification, fire block stairs contractor on site notified. 3/1/2004 1:06:24 AM
BLD-Footing2/11/20042/12/20042/12/2004APASS
DetailsRuss Owen
kim ###-#### . Ok slab for new stairs. 2/11/2004 6:51:01 PM
BLD-Conference2/4/20042/5/20042/5/2004PDONE
DetailsRuss Owen
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughesdid this yesterday 2/5/2004 3:54:04 PM
BLD-Conference2/4/20042/4/20042/4/2004PPART
DetailsRuss Owen
went over some restroom areas and ext wall doorway. 2/4/2004 5:30:43 PM 2/4/2004 5:31:07 PM
BLD-Conference2/2/20042/2/20042/2/2004PCANC
DetailsTroy James
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Contractor to reschedule with Russ. 2/2/2004 2:13:57 PM