FIRE-Final Inspection | 4/25/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Troy Cobbley
|
|
|
Curbing for the fire dept access has been installed as discussed. Fire life safety finaled
|
BLD-Conference | 11/16/2004 | 11/22/2004 | 11/22/2004 | A | PASS |
Tony Young
|
|
|
DARRIN PH####-####
temp occ. has been issued 11/22/2004 3:58:10 PM
|
BLD-Conference | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Tony Young
|
|
|
Darrin,,, ###-####
working on it,,,, Cathy W. is also helping 11/16/2004 2:29:58 PM
|
BLD-Conference | 11/9/2004 | 11/9/2004 | 11/9/2004 | P | PART |
Tony Young
|
|
|
getting paperwork 11/15/2004 10:48:58 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | NR |
Tony Young
|
|
|
|
BLD-Final | 3/23/2004 | 3/24/2004 | 3/24/2004 | A | PART |
Tony Young
|
|
|
Darren, ph# ###-####
ok after trades,,, also see BLD03-02405 for trades 3/24/2004 9:46:01 AM
|
BLD-Final | 3/23/2004 | 3/23/2004 | 3/23/2004 | P | NR |
Tony Young
|
|
|
Darrin, phone# ###-####
conf. only 3/23/2004 3:48:38 PM
|
BLD-Final | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | CANC |
Tony Young
|
|
|
###-#### darren
|
FIRE-Final Inspection | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | PART |
Troy Cobbley
|
|
|
Life safety finaled 3/23/2004 8:09:08 AM
|
FIRE-Final Inspection | 3/18/2004 | 3/19/2004 | 3/19/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide and test duct smoke detectors per IMC. Provide the correct remote leds. Paint curbing. Provide"door to remain unlocked during business hours" sticker. Provide approved door hardware on pocket doors and south facing exit door. Provide annual inspection for the fire extinguishers 3/19/2004 3:41:52 PM
|
BLD-Conference | 2/13/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to cover all, may need alt. plan on changes to int wall and energy report on ceiling change 2/17/2004 10:29:21 AM
|
BLD-Conference | 2/6/2004 | 2/6/2004 | 2/6/2004 | P | PART |
Tony Young
|
|
|
jeff ###-####
conf w/ architect, builder on changes to approved plans 2/6/2004 4:15:22 PM
|
BLD-Conference | 2/4/2004 | 2/5/2004 | 2/5/2004 | A | CANC |
Steven Webb
|
|
|
jim ###-####
|
BLD-Framing/Rough-in | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | PART |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ok to cover int. non-bearing partitions,,,, conf. on rest of framing 2/4/2004 2:04:22 PM
|
BLD-Framing/Rough-in | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | NR |
Tony Young
|
|
|
jeff-- ###-####
|
BLD-Framing/Rough-in | 1/15/2004 | 1/20/2004 | 1/20/2004 | A | PART |
Tony Young
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ext. shear ok 1/20/2004 9:51:55 AM
|
BLD-Conference | 12/29/2003 | 12/30/2003 | 12/30/2003 | A | PASS |
Tony Young
|
|
|
JEFF; Phone #: ###-#### Internet Inspection Request from: Darla Downs
conf. on 12 ft walls, ok w/ new engineering 2x6,
need to verify spacing of anchor bolts in sill plate 12/30/2003 11:28:10 AM
|
BLD-Foundation | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PART |
Tony Young
|
|
|
early pm please
|
BLD-Framing/Rough-in | 12/10/2003 | 12/11/2003 | 12/11/2003 | A | NR |
Tony Young
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Footing | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | NR |
Tony Young
|
|
|
BILL ###-####
|
BLD-Footing | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PART |
Tony Young
|
|
|
bill, ph# ###-####,, 2nd half of ftgs, wip 12/9/2003 2:29:25 PM
|
BLD-Footing | 12/8/2003 | 12/8/2003 | 12/8/2003 | A | PART |
Troy James
|
|
|
|
BLD-Footing | 12/5/2003 | 12/5/2003 | 12/5/2003 | P | NR |
Tony Young
|
|
|
Bill, re-inspection
|
BLD-Footing | 12/4/2003 | 12/5/2003 | 12/5/2003 | A | FAIL |
Tony Young
|
|
|
BILL ###-####
need soil report 12/5/2003 11:12:51 AM
|
BLD-Footing | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | NR |
Tom Arcoraci
|
|
|
BILL ###-#### no one one site no plans 12/4/2003 4:46:32 PM
|