BLD-Aging Inspection | 5/18/2009 | 5/18/2009 | 5/19/2009 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/19/2009 | 5/19/2009 | 5/19/2009 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/27/2009 | 2/27/2009 | 3/3/2009 | A | PASS |
Forrest France
|
|
|
Scope of fire life safety work okayed for final.
|
BLD-Final | 2/27/2009 | 2/27/2009 | 2/27/2009 | A | NR |
Dave Hannah
|
|
|
needs fire final
|
BLD-Aging Inspection | 2/20/2009 | 2/20/2009 | 2/27/2009 | | PART |
Dave Hannah
|
|
|
|
BLD-Final | 2/27/2009 | 2/27/2009 | 2/27/2009 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/4/2008 | 11/4/2008 | 11/4/2008 | | PART |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/12/2008 | 8/12/2008 | 8/13/2008 | | PART |
Dave Hannah
|
|
|
contractor will sch final
|
BLD-Aging Inspection | 5/20/2008 | 5/20/2008 | 5/20/2008 | | PART |
Dave Hannah
|
|
|
work in progress
|
BLD-Aging Inspection | 1/29/2008 | 1/29/2008 | 1/31/2008 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Framing/Rough-in | 11/29/2007 | 11/29/2007 | 11/30/2007 | P | PART |
Dave Hannah
|
|
|
rob Note: please call 1/2 hr prior to get in Phone #: ###-#### stairs on to 8th street
|
BLD-Framing/Rough-in | 11/2/2007 | 11/5/2007 | 11/5/2007 | A | PASS |
Dave Hannah
|
|
|
richard - suite 204 Phone #: ###-#### c/n items completed ok to cover
|
BLD-Framing/Rough-in | 10/22/2007 | 10/23/2007 | 10/23/2007 | A | PART |
Dave Hannah
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt need to strap dbl top plate at plb vent cut and fix roof joist cut by fire srkl cont
|
BLD-Conference | 8/22/2007 | 8/23/2007 | 8/24/2007 | P | PART |
Dave Hannah
|
|
|
rich Phone #: ###-####needs a landing at bottom of stairs
|
BLD-Conference | 6/25/2007 | 6/26/2007 | 6/26/2007 | P | PASS |
Dave Hannah
|
|
|
rich Phone #: ###-#### ok to reopen permits
|
BLD-Aging Inspection | 6/23/2006 | 6/23/2006 | 6/27/2006 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/7/2006 | 4/7/2006 | 4/11/2006 | | PASS |
Dave Hannah
|
|
|
wip
|
BLD-Conference | 4/10/2006 | 4/11/2006 | 4/11/2006 | A | PASS |
Dave Hannah
|
|
|
Dave: Paul and Alex would like to meet to review the 404 building permit close-out. Thank you.
|
BLD-Aging Inspection | 1/23/2006 | 1/23/2006 | 1/30/2006 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/25/2005 | 10/25/2005 | 11/1/2005 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Framing/Rough-in | 4/26/2005 | 4/27/2005 | 4/28/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/26/2005 at 1:51:56 PM. Contact: ###-####.OK TO COVER CEILING WITH HARD LID IN CORR
|
BLD-Framing/Rough-in | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 11:51:09 AM. Contact: ###-####.corrodor walls ok to cover 4/14/2005 4:27:47 PM
|
BLD-Conference | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/16/2005 at 1:35:54 PM. Contact: ###-####. ok to open ada rest rooms in basement need to fix ada stall in mens room 3/17/2005 9:50:30 AM
|
BLD-Conference | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | DONE |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/16/2005 at 10:01:45 AM. Contact: ###-####. wanted clarification of 2 hr shaft req. for exhaust fan , informed them to build it per plans and to be continuous to roof deck, it appears f/s damper will be required at duct penetration bottom of shaft. 2/16/2005 2:48:29 PM
|
BLD-Framing/Rough-in | 2/2/2005 | 2/3/2005 | 2/3/2005 | A | PART |
Dave Hannah
|
|
|
basement only please////chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore restrooms in basement ok to cover after allother trades r/i are signed off 2/3/2005 10:47:57 AM
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 5/5/2004 | 5/5/2004 | 5/5/2004 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 7:42:54 AM. Contact: ###-####.
|
BLD-Foundation | 3/24/2004 | 3/24/2004 | 3/24/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 6:32:40 AM. Contact: ###-####. front entry footings ok to pour 3/24/2004 9:51:44 AM
|
BLD-Framing/Rough-in | 2/12/2004 | 2/12/2004 | 2/12/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/12/2004 at 7:52:56 AM. Contact: ###-####. ok to cover bath room walls 2/12/2004 4:59:58 PM
|
BLD-Framing/Rough-in | 2/11/2004 | 2/11/2004 | 2/11/2004 | P | FAIL |
Dave Hannah
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs to fire proof floor opennings 2/11/2004 4:27:51 PM
|
BLD-Foundation | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | PASS |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Conference | 1/20/2004 | 1/20/2004 | 1/20/2004 | P | PART |
Rick Jackson
|
|
|
The fire sprinkler tamper valves are not supervised by the fire alarm system; when this project is finished the fire alarm control panel will be located outside and will be outside the listing of the panel; submittals are required for the tampers and relocation of the fire alarm panel 1/20/2004 3:13:48 PM
|
BLD-Footing | 1/8/2004 | 1/9/2004 | 1/9/2004 | A | PASS |
Dave Hannah
|
|
|
david ###-####
|
BLD-Framing/Rough-in | 12/30/2003 | 12/31/2003 | 12/31/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/30/2003 at 2:52:25 PM. Contact: ###-####. infill of window 3hr ok to cover 12/31/2003 10:13:21 AM
|
BLD-Framing/Rough-in | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/19/2003 at 9:08:59 AM. Contact: ###-####. ok to cover ext north face bld 404 12/19/2003 11:26:13 AM
|
BLD-Final | 2/27/2009 | 3/2/2009 | | P | |
Dave Hannah
|
|
|
|