Permit Information
Permit NumberBLD03-02412
StatusFinaled
Name JAMES WOODBURY (OWN/GC REP)
Site Address 404 S 8TH ST (BASE / 1ST / 2ND FLRS)
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(8TH STREET MARKETPLACE - BUILDING 404 - BASEMENT/1ST/2ND FLOORS) (2-24-05) PLAN MODIFICATION TO DEMOLISH A 400 SQUARE FOOT 1 STORY WITH BASEMENT PORTION OF THIS BUILDING LOCATED NEXT TO THE ALLEY TO CREATE AN AREA FOR TRANSFORMERS TO SERVE THE NEW HOTEL BUILDING THAT WILL BE LOCATED ACCROSS THE ALLEY. This building is fire sprinklered to substitute for 1-hr fire-resistance rated construction. To remodel areas located in the basement and on the 1st and 2nd floors of a building located in "The 8th Street Market Place" and addressed as 404 S. 8th Street. Selective demolition is also covered under this permit. Work is to include new core restrooms in the basement and on the 2nd floor, a wheelchair lift, a new 8th Street entrance, new Broad Street entrances, exterior wall finishes for the North wall, new elevated concrete terrace, and an expanded roof structure all per the approved drawings and the plan review report on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. DRH03-00064 (12-8-03) A COPY OF A LICENSE AGREEMENT WITH ACHD ALLOWING DOORS TO SWING INTO THE PUBLIC WAY SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT BEFORE THIS PERMIT IS FINALED. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/18/20095/18/20095/19/2009 PASS
DetailsDave Hannah
DOC - Permit Finaled5/19/20095/19/20095/19/2009PPASS
DetailsDave Hannah
FIRE-Final Inspection2/27/20092/27/20093/3/2009APASS
DetailsForrest France
Scope of fire life safety work okayed for final.
BLD-Final2/27/20092/27/20092/27/2009ANR
DetailsDave Hannah
needs fire final
BLD-Aging Inspection2/20/20092/20/20092/27/2009 PART
DetailsDave Hannah
BLD-Final2/27/20092/27/20092/27/2009ACANC
DetailsDave Hannah
BLD-Aging Inspection11/4/200811/4/200811/4/2008 PART
DetailsDave Hannah
BLD-Aging Inspection8/12/20088/12/20088/13/2008 PART
DetailsDave Hannah
contractor will sch final
BLD-Aging Inspection5/20/20085/20/20085/20/2008 PART
DetailsDave Hannah
work in progress
BLD-Aging Inspection1/29/20081/29/20081/31/2008 PASS
DetailsDave Hannah
work in progress
BLD-Framing/Rough-in11/29/200711/29/200711/30/2007PPART
DetailsDave Hannah
rob Note: please call 1/2 hr prior to get in Phone #: ###-#### stairs on to 8th street
BLD-Framing/Rough-in11/2/200711/5/200711/5/2007APASS
DetailsDave Hannah
richard - suite 204 Phone #: ###-#### c/n items completed ok to cover
BLD-Framing/Rough-in10/22/200710/23/200710/23/2007APART
DetailsDave Hannah
Rob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt need to strap dbl top plate at plb vent cut and fix roof joist cut by fire srkl cont
BLD-Conference8/22/20078/23/20078/24/2007PPART
DetailsDave Hannah
rich Phone #: ###-####needs a landing at bottom of stairs
BLD-Conference6/25/20076/26/20076/26/2007PPASS
DetailsDave Hannah
rich Phone #: ###-#### ok to reopen permits
BLD-Aging Inspection6/23/20066/23/20066/27/2006 DEFR
DetailsDave Hannah
BLD-Aging Inspection4/7/20064/7/20064/11/2006 PASS
DetailsDave Hannah
wip
BLD-Conference4/10/20064/11/20064/11/2006APASS
DetailsDave Hannah
Dave: Paul and Alex would like to meet to review the 404 building permit close-out. Thank you.
BLD-Aging Inspection1/23/20061/23/20061/30/2006 PASS
DetailsDave Hannah
BLD-Aging Inspection10/25/200510/25/200511/1/2005 PASS
DetailsDave Hannah
work in progress
BLD-Framing/Rough-in4/26/20054/27/20054/28/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/26/2005 at 1:51:56 PM. Contact: ###-####.OK TO COVER CEILING WITH HARD LID IN CORR
BLD-Framing/Rough-in4/14/20054/14/20054/14/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/14/2005 at 11:51:09 AM. Contact: ###-####.corrodor walls ok to cover 4/14/2005 4:27:47 PM
BLD-Conference3/16/20053/17/20053/17/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/16/2005 at 1:35:54 PM. Contact: ###-####. ok to open ada rest rooms in basement need to fix ada stall in mens room 3/17/2005 9:50:30 AM
BLD-Conference2/16/20052/16/20052/16/2005PDONE
DetailsTroy James
Scheduled by a contractor via Hello! on 2/16/2005 at 10:01:45 AM. Contact: ###-####. wanted clarification of 2 hr shaft req. for exhaust fan , informed them to build it per plans and to be continuous to roof deck, it appears f/s damper will be required at duct penetration bottom of shaft. 2/16/2005 2:48:29 PM
BLD-Framing/Rough-in2/2/20052/3/20052/3/2005APART
DetailsDave Hannah
basement only please////chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore restrooms in basement ok to cover after allother trades r/i are signed off 2/3/2005 10:47:57 AM
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection8/2/20048/2/20048/2/2004 PASS
DetailsDave Hannah
BLD-Conference5/5/20045/5/20045/5/2004PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/5/2004 at 7:42:54 AM. Contact: ###-####.
BLD-Foundation3/24/20043/24/20043/24/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/24/2004 at 6:32:40 AM. Contact: ###-####. front entry footings ok to pour 3/24/2004 9:51:44 AM
BLD-Framing/Rough-in2/12/20042/12/20042/12/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/12/2004 at 7:52:56 AM. Contact: ###-####. ok to cover bath room walls 2/12/2004 4:59:58 PM
BLD-Framing/Rough-in2/11/20042/11/20042/11/2004PFAIL
DetailsDave Hannah
Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs to fire proof floor opennings 2/11/2004 4:27:51 PM
BLD-Foundation1/27/20041/28/20041/28/2004APASS
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Conference1/20/20041/20/20041/20/2004PPART
DetailsRick Jackson
The fire sprinkler tamper valves are not supervised by the fire alarm system; when this project is finished the fire alarm control panel will be located outside and will be outside the listing of the panel; submittals are required for the tampers and relocation of the fire alarm panel 1/20/2004 3:13:48 PM
BLD-Footing1/8/20041/9/20041/9/2004APASS
DetailsDave Hannah
david ###-####
BLD-Framing/Rough-in12/30/200312/31/200312/31/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/30/2003 at 2:52:25 PM. Contact: ###-####. infill of window 3hr ok to cover 12/31/2003 10:13:21 AM
BLD-Framing/Rough-in12/19/200312/19/200312/19/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/19/2003 at 9:08:59 AM. Contact: ###-####. ok to cover ext north face bld 404 12/19/2003 11:26:13 AM
BLD-Final2/27/20093/2/2009 P 
DetailsDave Hannah